![Fayat BOMAG BW 124 PDH-5 Operating Instruction, Maintenance Instruction Download Page 25](http://html1.mh-extra.com/html/fayat/bomag-bw-124-pdh-5/bomag-bw-124-pdh-5_operating-instruction-maintenance-instruction_546857025.webp)
3.2
Definition of responsible persons
3.2.1
Operating company
The operating company is the natural or jurid-
ical person who uses the machine or in who's
name the machine is used.
The operating company must make sure that
the machine is only used for the purpose it is
intended for and in strict compliance with the
safety regulations mentioned in these operating
and maintenance instructions.
The operating company must determine and
assess the danger in its company. It must then
take appropriate action to ensure health and
safety at work for its employees and point out
any remaining dangers.
The operating company must determine
whether there are special operational hazards
such as a toxic atmosphere or limiting soil con-
ditions. Such conditions require special, addi-
tional measures to remove or reduce the
hazard.
The operating company must make sure that
all users read and understand the information
concerning safety.
The operating company is responsible for the
planning and professional execution of regular
safety inspections.
3.2.2
Expert / qualified person
An expert / qualified person is a person who,
based on his/her professional education and
experience, has profound knowledge in the
field of construction equipment and the
machine in question in particular.
Concerning your safety – Definition of responsible persons
BW 124 PDH-5
25
Summary of Contents for BOMAG BW 124 PDH-5
Page 9: ...1 Introduction Introduction BW 124 PDH 5 9 ...
Page 13: ...2 Technical data Technical data BW 124 PDH 5 13 ...
Page 18: ...Technical data Noise and vibration data BW 124 PDH 5 18 ...
Page 19: ...3 Concerning your safety Concerning your safety BW 124 PDH 5 19 ...
Page 69: ...4 Indicators and control elements Indicators and control elements BW 124 PDH 5 69 ...
Page 81: ...5 Checks prior to start up Checks prior to start up BW 124 PDH 5 81 ...
Page 86: ...6 Push the dipstick in Checks prior to start up Checking the engine oil level BW 124 PDH 5 86 ...
Page 92: ...3 Close the cap Checks prior to start up Checking the coolant level BW 124 PDH 5 92 ...
Page 95: ...6 Operation Operation BW 124 PDH 5 95 ...
Page 118: ...Operation Emergency procedures BW 124 PDH 5 118 ...
Page 119: ...7 Loading transporting the machine Loading transporting the machine BW 124 PDH 5 119 ...
Page 127: ...8 Maintenance Maintenance BW 124 PDH 5 127 ...
Page 195: ...9 Troubleshooting Troubleshooting BW 124 PDH 5 195 ...
Page 204: ...Troubleshooting Trouble shooting ECONOMIZER BW 124 PDH 5 204 ...
Page 205: ...10 Disposal Disposal BW 124 PDH 5 205 ...
Page 207: ...11 List of special tools List of special tools BW 124 PDH 5 207 ...
Page 208: ...List of special tools BW 124 PDH 5 208 ...
Page 209: ......