8.8.3
Checking, tensioning the V-belt
8.8.3.1
Checking the V-belt
Protective equip-
ment:
n
Working clothes
n
Protective gloves
1.
Park the machine in secured condition
Chapter 6.6 „Parking the machine in
secured condition“ on page 106
2.
Allow the engine to cool down.
3.
Check the entire circumference of the V-
belt for damage and cracks.
4.
Replace a damaged or cracked V-belt
Chapter 8.9.3 „Replacing the V-
5.
Check with thumb pressure whether the V-
belt can be depressed more than
7 to 9 mm (0.28 – 0.35 inch) between the
V-belt pulleys, retighten if necessary.
8.8.3.2
Tightening the V-belt
Protective equip-
ment:
n
Working clothes
n
Protective gloves
1.
Loosen the tensioning screw (1) and the
screw (2) on the generator.
2.
Press the generator towards the outside
using a lever, until the correct V-belt ten-
sion is reached.
3.
Retighten clamping screw (1) and screw
(2).
Fig. 111
Fig. 112
Maintenance – Every 250 operating hours
BW 124 PDH-5
147
Summary of Contents for BOMAG BW 124 PDH-5
Page 9: ...1 Introduction Introduction BW 124 PDH 5 9 ...
Page 13: ...2 Technical data Technical data BW 124 PDH 5 13 ...
Page 18: ...Technical data Noise and vibration data BW 124 PDH 5 18 ...
Page 19: ...3 Concerning your safety Concerning your safety BW 124 PDH 5 19 ...
Page 69: ...4 Indicators and control elements Indicators and control elements BW 124 PDH 5 69 ...
Page 81: ...5 Checks prior to start up Checks prior to start up BW 124 PDH 5 81 ...
Page 86: ...6 Push the dipstick in Checks prior to start up Checking the engine oil level BW 124 PDH 5 86 ...
Page 92: ...3 Close the cap Checks prior to start up Checking the coolant level BW 124 PDH 5 92 ...
Page 95: ...6 Operation Operation BW 124 PDH 5 95 ...
Page 118: ...Operation Emergency procedures BW 124 PDH 5 118 ...
Page 119: ...7 Loading transporting the machine Loading transporting the machine BW 124 PDH 5 119 ...
Page 127: ...8 Maintenance Maintenance BW 124 PDH 5 127 ...
Page 195: ...9 Troubleshooting Troubleshooting BW 124 PDH 5 195 ...
Page 204: ...Troubleshooting Trouble shooting ECONOMIZER BW 124 PDH 5 204 ...
Page 205: ...10 Disposal Disposal BW 124 PDH 5 205 ...
Page 207: ...11 List of special tools List of special tools BW 124 PDH 5 207 ...
Page 208: ...List of special tools BW 124 PDH 5 208 ...
Page 209: ......