![Fayat BOMAG BW 124 PDH-5 Operating Instruction, Maintenance Instruction Download Page 160](http://html1.mh-extra.com/html/fayat/bomag-bw-124-pdh-5/bomag-bw-124-pdh-5_operating-instruction-maintenance-instruction_546857160.webp)
1.
Park the machine in secured condition
Chapter 6.6 „Parking the machine in
secured condition“ on page 106
2.
Check all hydraulic lines.
Hydraulic hoses must be immediately
replaced if:
n
the outer layer is damaged down to the
inlay (e.g. chafing, cuts, cracks),
n
embrittlement of the outer layer or for-
mation of cracks in the hose material,
n
the hose shows deformation in pressur-
ized and depressurized condition, which
do not comply with the genuine shape of
the hydraulic hose (e.g. layer separa-
tion, formation of blisters, crushed spots,
buckling),
n
leaks on hose, socket or fitting,
n
the hydraulic hose has separated from
the fitting,
n
fittings are damaged or deformed,
whereby the function and strength of the
hose - fitting connection is impaired,
n
the fitting shows corrosion that impairs
both function and strength,
n
incorrect installation (squeezing,
shearing or chafing points),
n
paint covered hydraulic hoses (no detec-
tion of identifications or cracks),
n
shelf life and service life exceeded.
3.
Replace damaged hydraulic hoses immedi-
ately, fasten these properly and avoid
chafing.
4.
Only operate the machine after it has been
repaired.
Maintenance – Every 500 operating hours
BW 124 PDH-5
160
Summary of Contents for BOMAG BW 124 PDH-5
Page 9: ...1 Introduction Introduction BW 124 PDH 5 9 ...
Page 13: ...2 Technical data Technical data BW 124 PDH 5 13 ...
Page 18: ...Technical data Noise and vibration data BW 124 PDH 5 18 ...
Page 19: ...3 Concerning your safety Concerning your safety BW 124 PDH 5 19 ...
Page 69: ...4 Indicators and control elements Indicators and control elements BW 124 PDH 5 69 ...
Page 81: ...5 Checks prior to start up Checks prior to start up BW 124 PDH 5 81 ...
Page 86: ...6 Push the dipstick in Checks prior to start up Checking the engine oil level BW 124 PDH 5 86 ...
Page 92: ...3 Close the cap Checks prior to start up Checking the coolant level BW 124 PDH 5 92 ...
Page 95: ...6 Operation Operation BW 124 PDH 5 95 ...
Page 118: ...Operation Emergency procedures BW 124 PDH 5 118 ...
Page 119: ...7 Loading transporting the machine Loading transporting the machine BW 124 PDH 5 119 ...
Page 127: ...8 Maintenance Maintenance BW 124 PDH 5 127 ...
Page 195: ...9 Troubleshooting Troubleshooting BW 124 PDH 5 195 ...
Page 204: ...Troubleshooting Trouble shooting ECONOMIZER BW 124 PDH 5 204 ...
Page 205: ...10 Disposal Disposal BW 124 PDH 5 205 ...
Page 207: ...11 List of special tools List of special tools BW 124 PDH 5 207 ...
Page 208: ...List of special tools BW 124 PDH 5 208 ...
Page 209: ......