Inspections
Utility Sprayer 25' / 30' / 40' / 45'
Page 12
Inspections
Pre-Delivery
After the machine has been completely assembled, inspect it to be sure it is in good running order
before delivering it to the customer. Ensure each item is found satisfactory or proper adjustment
to the item(s) is made.
The following checklist is a reminder of points to inspect. It is neither an exclusive nor an
exhaustive list of points to inspect. See the
o
SMV
emblem is installed, protective
shipping tape
is removed from reflectors, and
lights
are installed.
o
All
grease
fittings
are lubricated (see
LUBRICATION and MAINTENANCE
section in this
Manual.)
o
Inspect to be sure all
nuts
are tightened to proper torque and all
cotter pins
are spread.
o
The
tires
).
o
Wheel bolts
are tightened to their specified torque(s).
o
Fertilizer
row units
are properly adjusted.
o
Warning
lights
are properly installed and operational.
o
All customer-ordered
attachments
are installed or are available for delivery.
o
Any parts scratched in shipment are touched up with
paint
.
o
All
shipping decals
are removed.
o
Transport pins
are inserted in the transport holes.
This machine has been thoroughly checked and to the best of my knowledge is ready for delivery
to the customer.
Signed: _________________________
Date: _________________________
Summary of Contents for UT3P25
Page 1: ...UT3P25 30 30BL 40 45 H40 H45 UTILITY SPRAYER OWNER S MANUAL...
Page 2: ...820037 25 30 40 45 Utility Sprayer 2023 11 15...
Page 8: ...Table of Contents Utility Sprayer 25 30 40 45 Page 8...
Page 32: ...SAFETY SAFETY Utility Sprayer 25 30 40 45 Page 32 General...
Page 41: ...HYDRAULIC FLOW HYDRAULIC FLOW Utility Sprayer 25 30 40 45 Page 41...