23
GROWSPAN
™
ROUND PRO GREENHOUSES AND SYSTEMS
Revision date: 01.03.19
Complete the following general steps to install end wall
panels.
1. Consult panel location diagrams, select one 4' x 8'
polycarbonate panel, begin at the edge of double door
opening, and work to the outside edge of end wall. See
Panel A
in diagram below for first panel.
END PANEL INSTALLATION (continued)
Mark UV Side
X
3. Remove protective film and mark UV-protected surface.
4. Apply vent tape to bottom of panel and attach 104213
profile to panel edge adjacent to door as shown on
Polycarbonate Panels diagram in Quick Start section.
2. Measure area and cut panel to size. Review panel
layout diagrams in Quick Start section.
Remember to
account for H-channel dimensions between panels.
5. Place panel in position, attach it to end wall framing
using FA4484B Tek screws and 102921B washers.
NOTE:
When preparing any panel for installation and
attaching aluminum profile, remember to account for
areas where different sections of profile intersect so
profile is cut to proper length and installed to achieve
the desired finished appearance.
Space screws evenly
at 16"
on-center when securing
panels. DO NOT USE WASHERS WHEN SECURING
H-CHANNEL TO END WALL FRAMING.
6. Use remainder of 4' x 8' side panel (A) adjacent to door
to cover same area along remaining side of door (B).
ATTENTION:
Prepare panel as previously described.
Only the bottom edge of all lower panels is covered
with vent tape.
Dashed line and small arrows (above) show where
to install the white vent tape.
Install tape along this
bottom edge only.
A
X
H-channel here – outer
edge and top of panel.
104213 U-profile here along door edge.
104213 U-profile
here along door
edge.
A
B