to be used in conjunction with the online assembly video  

found at www.gabrielash.com 

Certified Installers if required 

 

Thomas Hearn 07540 618852 

Matthew Honeyborne 07977 788242 

Franco Loriente 07951 985242 

Leigh Goodchild (South West England) 07971 251261 

Malcolm Blackwood (Scotland) 07956 587152  

 

 

Summary of Contents for essential Series

Page 1: ...he online assembly video found at www gabrielash com Certified Installers if required Thomas Hearn 07540 618852 Matthew Honeyborne 07977 788242 Franco Loriente 07951 985242 Leigh Goodchild South West...

Page 2: ...handling glass Low Threshold refer to step 29 If you choose to fit this a clear mastic sealant can be applied along its length at ground level Also anti slip tape PT705 is supplied and can be applied...

Page 3: ...8mm SC027 4 2mm x 65mm SC121 4 2mm x 9 5mm SC127 4 2mm x 45mm SC156 4 8mm x 65mm FX200 18mm x 40mm WA501 18mm x 5 3mm Diameter Black Nylon SC125 4 2mm x 25mm SC004 3 5mm x 19mm SC057 4 8mm x 80mm scre...

Page 4: ...six house glass chart door end and side walls...

Page 5: ...six house glass chart plain end and roof panels...

Page 6: ...eight house glass chart door end and side walls...

Page 7: ...eight house glass chart plain end and roof panels...

Page 8: ...L2006 1330 8 House AL2006 1560 AL3098 AL3099 AL3065 AL2542 0830 6 House AL2570 0685 6 House AL2570 0595 8 House AL2570 0800 8 House AL2007 0759 6 House AL2007 0644 3 Panel AL2028 1836 4 Panel AL2028 2...

Page 9: ...e splayed Fig 2 Dig a hole in the ground where each anchor leg will be situated and set the legs into the holes ensuring the steel base is square and level before filling the holes with concrete or po...

Page 10: ...se W002 54 8 House W002 58 6 House W002 54 8 House W002 58 6 House W002 35 8 House W002 45 W004 52 W004 53 6 House W003 53 6 House W312 02 8 House W312 03 8 House W003 55 6 House W003 54 8 House W003...

Page 11: ...1 assemble door end gable W005 50 W005 51 SC156 x 4 SC156 x 4 flush...

Page 12: ...1 assemble door end gable SC057 6 House W301 01 8 House W301 05 6 House W301 02 8 House W301 06...

Page 13: ...SC057 AL3300 SC125 1 assemble door end gable I II III IV...

Page 14: ...2 assemble plain end gable 6 house 6 House W002 05 W003 57 W003 58 W004 52 W004 53 W002 55 W002 55 SC056 x 8...

Page 15: ...2 assemble complete plain end gable 6 house in same manner as door end W002 55...

Page 16: ...2 assemble plain end gable 8 house SC056 x 8 W003 57 W003 58 W003 59 W002 08 W002 55...

Page 17: ...2 assemble complete plain end gable 8 house in same manner as door end W002 55 W002 55...

Page 18: ...drilled hinge pilot holes at sash position Pre drilled hinge pilot holes at sash position 8 ft length 10 ft length 6 ft W300 01 8 ft W300 02 10 ft W300 03 6 ft W002 05 8 ft W002 08 10 ft W002 10 W003...

Page 19: ...Section A A Section B B A A B B 3 assemble side walls...

Page 20: ...SC056 SC056 SC056 Please Note Ensure shaded faces are flush SC056 3 assemble side walls...

Page 21: ...4 fix door end gable to side wall and position on base SC156 x 4...

Page 22: ...5 fix plain end gable and second side wall and fix to steel base A SC125 A A A...

Page 23: ...6 hang sash windows and fit stay IR304 and pins IR305 7 fit door bottom guide al1570 SC004 x4 SC004 x2 SC004 x4 A A Section A A SC125 Al1570 6 house 595mm Al1570 8 house 800mm...

Page 24: ...SC027 x 2 AL3300 8 fix ridge board to gables SC125 x 4 6ft SA5040 8ft SA5041 10ft SA5042...

Page 25: ...9 fix pt121to roof spars 10 fix under vent rail PT121 SC125 x 2 SC156 6 house w302 01 8 house w302 04 6 house w302 02 6 house w302 03 8 house w302 05 8 house w302 06 w307 01...

Page 26: ...11 fix roof spars to ridge and side walls SC125 SC125...

Page 27: ...PT206 PT206 12 fix pt206 and hook gutter to wall PT200 PT205 13 fix spigot pt200 and gutter end caps...

Page 28: ...14 glaze roof and fix roof cappings PT206 A A SC125 A A I II III IV V 6 house w303 16 8 house w303 17...

Page 29: ...SC027 x 3 15 fix roof vent hinge rail IV II III SC125 PT120 I 16 glaze roof vent and fix into position sa5011 sa5001 489mm 568mm SC125...

Page 30: ...W304 04 half capping SC125 W303 04 capping 17 glaze the sides I II III IV...

Page 31: ...Do not fix at this stage 18 glaze both gable ends W304 05 left hand W304 06 right hand W303 08 left hand W303 09 right hand SC125 W313 02...

Page 32: ...20 fix door runner top guide A A Section A A SC006 21 fit door runner SC125 x 2 Use holes which line up with centre of capping either side of door Door runner end flush with side of capping 477mm 580...

Page 33: ...22 fix al3065 door runner vertical support Position Vertical support mark and using a 7mm drill bit drill a hole through the door runner SC125 23 fix al3301 ridge end cap AL3301 SC125 x 2 BL325 NU101...

Page 34: ...SC125 A A A A Top 24 fit door wheel brackets to front of door SC125 x 2 25 fit bottom guide to back of door...

Page 35: ...26 locate door 27 Adjust door if required and fit handles Adjust and Lock into Position With Screw Type SC125 W056 01 SC127...

Page 36: ...28 fit low threshold when on steel base Al2542 830 BL327 NU101 I II III IV Using a 7mm drill bit drill a hole through both legs of the low threshold and through the steel base...

Page 37: ...29 fit staple to door and hasp to door aperture upright if required SC004 x 2 SC125 x 2...

Page 38: ...I PT201 3mm PT203 SC125 SC121 II III IV V VI VII 30 fit downpipes and shoes...

Page 39: ...d shelving instructions Door End Door End Plain End Plain End 545mm 545mm 605mm 605mm 775mm 775mm 775mm 605mm Type B 6 x 6 6 x 8 and 6 x 10 Batten Positions 8 x 10 Batten Positions SC128 SC026 BL425 N...

Page 40: ...SC128 x 8 BL425 WA002 NU200 SC128 x 2 SC026 x 2 A A SECTION A A staging and shelving instructions...