background image

MODEL:
PRODUCT SIZE(LxWxH):107x55x188cm
PLEASE READ CAREFULLY BEFORE ASSEMBLY

NURSERY GREENHOUSE

Assembly Instructions

NURSERY GREENHOUSE

Summary of Contents for NURSERY GREENHOUSE

Page 1: ...MODEL PRODUCT SIZE LxWxH 107x55x188cm PLEASE READ CAREFULLY BEFORE ASSEMBLY NURSERY GREENHOUSE Assembly Instructions NURSERY GREENHOUSE ...

Page 2: ...e Assembly Y4 1 W03 2 W02 4 Y4 1 W03 2 W02 4 2 Y10 J09 J08 1 1 1 1 1 Z01 Ø4X16D 6 Body Frame Assembly L19 PART NO Qty L20 L21 PART NO Qty L01B 4 L05A 1 C 6 Y3 1 W02 4 L05B 1 3 Z01 L15A 1 L05C 1 Roof Frame Assembly Ø4X16D NOTE Each Polycarbonate Panel comes with UV protected properties Please ensure the transparent film faces out toward the Sun Remove both films before installation of the panels L0...

Page 3: ...1 L08B PART NO Qty L08A 1 L08E 2 D 4 Y4 1 W03 2 W02 4 3 Door1 Frame Assembly ...

Page 4: ...nto L08E then insert the whole part into L08A B and tighten them gently Slide 4 x W02 into each profile then adjust the screws in connector D to a horizontal position and insert each connector D into each profile tighten them gently Finally secure 2 x W03 brackets in the top see Fig above Slide panel Y4 into the channels of L08A B and cover Y4 with another L08E to complete the first door ...

Page 5: ...1 L08D PART NO Qty L08C 1 L08E 2 D 4 Y4 1 W03 2 W02 4 5 Door2 Frame Assembly ...

Page 6: ...2 L08C L08E D W02 W02 L08E L08D 7 8 W03 W03 7 8 L08D REPEAT the assembly of Door1 Frame Assembly Slide panel Y4 into the channels of L08C D and cover Y4 with another L08E to complete the second door REPEAT the assembly of Door1 Frame Assembly D D L08E ...

Page 7: ...Y10 L19 Z01 L20 L20 L19 L19 L21 L21 L19 Z01 Z01 L19 J09 J08 Y10 J09 J08 1 1 1 Z01 Ø4X16D 6 J08 J09 L19 L20 L21 PART NO Qty 2 1 1 Vent Frame Assembly 9 10 11 7 ...

Page 8: ...PART NO Qty L01B 4 L05A 1 C 6 Y3 1 W02 4 L05B 1 3 Z01 L15A 1 L05C 1 Roof Frame Assembly 8 Ø4X16D ...

Page 9: ...12 13 14 15 12 13 14 15 L01B L01B L01B L01B L05B C C C C 9 Adjust the screws in connector C to a horizontal position and insert connector C into L05B L01B then tighten them gently see Fig ...

Page 10: ...16 L05C J07 This pre fixed J07 is to hold J08 vent supporter 10 Slide 2 x W02 into each L05A L05C then adjust the screws in connector C to a horizontal position and insert connector C into L05A L05C L01B then tighten them gently see Fig above 17 ...

Page 11: ...18 19 19 L05B L15A Z01 11 Put L15A on L05B in place as shown drill 3 holes on L05B through 3 pre drilled holes of L15A Dia 3 2mm then secure L15A and L05B with Z01 ...

Page 12: ...A 2 PART NO Qty L01A 2 L03A 1 1 L03B 2 L02A L06A 1 L06B 1 L07A 1 1 Y1 2 Y2 2 L04A L02B 1 12 Y5 2 B 2 W03 12 W05 4 4 S03 M8x60 W02 20 Body Frame Assembly ...

Page 13: ... W02 W02 W02 W02 20 21 22 23 Slide 6 x W02 into each profile 2 into the back and 2 into each side then adjust the screws in connector A B to a horizontal position and insert connector A B into each profile then tighten them gently see Fig above ...

Page 14: ...Y2 L06B L02B 24 Insert panel Y2 into the channel of L02B and push Y2 gently until it touches connector A Insert L06B into the channel of L02B then turn it 90 degrees SO L06B covers the edge of Y2 see right Fig ...

Page 15: ...15 Y2 25 ...

Page 16: ...16 L06A 26 Slide in L06A to cover Y2 and L06B then make sure Y2 and the fixings of L06B are in the channel of L06A at each end ...

Page 17: ...17 W02 W02 W02 27 Slide each W02 into each end of L06A x1 x1 ...

Page 18: ... from the top and make sure Y2 and the fixings of L06A are in the channel of L01A see Fig above Slide in 8 x W02 from the bottom then adjust the screws in connector A B to a horizontal position and insert each corner profile onto connector A B then tighten them gently see Fig above 18 ...

Page 19: ...W03 W03 W03 W03 W03 W03 W03 W03 W03 W03 33 33 Install 8 x W03 in each corner 19 ...

Page 20: ...L07A 34 34 Insert L07A into L03A B and tighten them gently see Fig above 20 ...

Page 21: ...Y5 Y5 35 35 Y1 Y1 21 ...

Page 22: ...connector and then tighten them gently see Fig below Roof Frame Assembly Door1 Frame Assembly Door2 Frame Assembly Slide in 4 x W02 from the top of each corner profile then adjust the screws in connector C to a horizontal position and insert Roof Frame Assembly into each corner profile then tighten them gently see Fig above 22 ...

Page 23: ...W03 W03 W03 W03 38 38 W05 W05 W05 W05 39 39 Install 4 x W03 in each corner Masonry anchors for installation on concrete are provided If installing onto timber use a timber screw not provided 23 ...

Page 24: ...L09 6 L10 33 W01 12 66 Z01 PART NO Qty Final Assembly 24 Ø4X16D ...

Page 25: ...Z01 L15A L20 40 25 Vent Frame Assembly Assemble the window vent by sliding L20 into L15A as shown and tighten L15A at each end with Z01 ...

Page 26: ...1 W01 W01 W01 W01 W01 W01 W01 W01 W01 W01 L09 L09 L10x11pcs 42 43 Z01 41 41 26 Put 12 x W01 on the hangers of L01A L03A B at the positions where you want to install the shelves W01 Secure L10 onto L09 with screws ...

Page 27: ...3 shelves 44 27 Put each shelf onto each W01 ...

Reviews: