
37
36
36
37
W02
W02
W02
W02
W02
Put on each 'Door Frame
Assembly'.
Insert 'Roof Frame Assembly' into each corner profile with
each connector and then tighten them gently (see Fig. below).
Roof Frame Assembly
Door1 Frame Assembly
Door2 Frame Assembly
Slide in 4 x W02 from the top of each corner profile,then adjust the screws in connector C
to a horizontal position and insert 'Roof Frame Assembly' into each corner profile,
then tighten them gently(see Fig. above).
22
Summary of Contents for NURSERY GREENHOUSE
Page 3: ...1 L08B PART NO Qty L08A 1 L08E 2 D 4 Y4 1 W03 2 W02 4 3 Door1 Frame Assembly ...
Page 5: ...1 L08D PART NO Qty L08C 1 L08E 2 D 4 Y4 1 W03 2 W02 4 5 Door2 Frame Assembly ...
Page 15: ...15 Y2 25 ...
Page 17: ...17 W02 W02 W02 27 Slide each W02 into each end of L06A x1 x1 ...
Page 19: ...W03 W03 W03 W03 W03 W03 W03 W03 W03 W03 33 33 Install 8 x W03 in each corner 19 ...
Page 20: ...L07A 34 34 Insert L07A into L03A B and tighten them gently see Fig above 20 ...
Page 21: ...Y5 Y5 35 35 Y1 Y1 21 ...
Page 24: ...L09 6 L10 33 W01 12 66 Z01 PART NO Qty Final Assembly 24 Ø4X16D ...
Page 27: ...3 shelves 44 27 Put each shelf onto each W01 ...