CH27 ACR/ACC PROFI
25
A
D
C
B
D
F
E
MOUNTING OF THE DISCHARGE PIPE
1. Mount the lower part of the discharge pipe
(A) using the mounting hardware (B). Al-
ways clamp the lower part with levers (C)
(fig. 1).
2. Lift the discharge pipe to the correct height
and insert the M20x260 pin (D).
3. Move the discharge pipe to the working
position and secure it using the wing nut
(E) (fig. 2).
4. The long discharge pipe (F) is assembled on
the floor before it is mounted at the cor-
rect position in the same way as the short
discharge pipe. Insert the M20x260 pin (D),
set the discharge pipe to the upper posi-
tion and secure it using the wing nut.
If the chipper is equipped with an optional dis-
charge pipe control device, the latter must be
mounted on the chipper before the discharge
pipe. First, the control device is mounted to
the chipper using the lock band and then the
discharge pipe is installed to the control device
as described above.
Fig. 1.
Summary of Contents for BC3000
Page 2: ......
Page 17: ...CH27 ACR ACC PROFI 17 DIMENSIONS CH27ACR CH27ACC TRANSPORT POSITION CH27ACC SL27 HK4670 ...
Page 31: ...CH27 ACR ACC PROFI 31 BC3000 CH27 1 2 3 ...
Page 32: ...CH27 ACR ACC PROFI 32 BC3000 CH27 4 5 6 ...
Page 34: ...CH27 ACR ACC PROFI 34 ...
Page 74: ...CH27 ACR ACC PROFI 74 200003767 SMART FEED BASIC CABIN 1 CHIPPER CABIN 2 1 6 5 4 3 2 7 ...
Page 97: ...CH27 ACR ACC PROFI 97 ...
Page 105: ...CH27 ACR ACC PROFI 105 ...
Page 106: ...CH27 ACR ACC PROFI 106 200001339 FEED CONVEYOR ACC ...
Page 117: ...CH27 ACR ACC PROFI 117 ...
Page 121: ...CH27 ACR ACC PROFI 121 200002373 CROSS BREAKER ACCESSORY ...
Page 122: ...CH27 ACR ACC PROFI 122 ...
Page 128: ...Smart Choices Since 1962 ...