14
2.6 MAINTENANCE SPACE
During installation of the machine, it is advisable to set up an area for later maintenance operations, as indicated
in fig. 8.
IMPORTANT: the values in the tables are the recommended minimum values.
2.7 ELECTRIC PLUG-IN
WARNING!
Before plugging in, make sure you have a proper grounding system which follows the current
European Laws (EN).
Check the compatibility of the network voltage with the specificatins in the appropriate label
in the machine (fig. 2).
Power fluctuations greater than ±10% of the nominal voltage indicated in the label can cause
serious damage on the machine. That damage in not covered by the warranty.
IMPORTANT: verify that the power cable is the right size.
Turn the switch on the 0 position in the F85 CV-F120-F240 models (pos. A fig.11), in the F85 (pos. A
fig.11B).
Insert the machine’s power cable through the gland under the power grid (pos. B fig.7). Connect wires in the
terminal by following the attached electric plan (TAV. 2) and following.
IF THE MACHINE HAS THE FUMES VENT:
Plug the fumes suction grid’s cable (pos. C fig.7).
Once the cable has been plugged, the suction vents’ orientation should be checked.
In the F85 CV-F120-F240 models, proceed as follows:
- Turn on the manual operation of the vents’ thermostat (press the white button) (fig.9);
- Turn on the general switch (fig.10);
The values in the table are expressed in mm.
F28
F55
F85
F120
F240
F350
1000 600 600 1500
1000 600 600 1500
1000 600 600 1500
1200 600 600 1800
1200 600 600 1800
1200 600 600 2000
A B
C
D
A
B
D
C
FIG.8