4.2  ELECTRIC SYSTEM

 

F

Before performing any operation, disconnect the mains power sup-
ply.  If the disconnecting switch is not visible, put up a ''ATTENTION 
- Maintenance in progress'' sign.

 

!

The electrical system must comply with the regulations in force in the 
country of installation.
Use CE-marked components and materials that comply with the Low 
Voltage Directive 2006/95/EC and the EMC Directive 2004/108.
The mains power supply of the automation must be fitted with a 6 A 
omnipolar circuit breaker with a contact opening distance equal to 
or greater than 3 mm, for disconnection purposes in accordance with 
current regulations.
The mains power supply of the automation must be equipped with a 
differential switch with a threshold of 0.03 A.
The metal masses of the structure must be earthed.
Check that the earthing system is set up in compliance with the regula-
tions in force in the country of installation.
The electrical cables of the automation system must be sized and have 
an insulation rating in accordance with regulations in force, placed in 
adequate rigid or flexible pipes that are exposed or concealed.
Use separate pipes for power cables and for connection cables of 12-24 
V control devices/accessories.
Consult the concealed cable plan to ensure there are no electrical 
cables near excavations and drilling areas so as to avoid the risk of 
electrocution.
Ensure there are no pipes near the excavations and drilling areas.
The electronic board must be housed in an enclosure which guarantees 
minimum IP 44 protection.
The board enclosure must be placed in a non-hazardous area, which is 

Typical system

Minimum section of cables

1 Power supply 230 V~ 50 Hz 

3G 1.5 mm²

2 Board enclosure and circuit breaker
3 Actuator S800 ENC

4G 1.5 mm²

4 BUS encoder

2 x 0.5 mm² (length MAX 50 m)

5 Junction box
6 Key button 
7 Pair of BUS 2easy photocells
8 Flashing light

accessible even with open leaf, at least 30 cm from the ground.
The board enclosure must be fitted with a lock or other device that 
prevents access to unauthorised persons.  The cable outputs must be 
directed downwards.  The pipe fittings to the enclosure must prevent 
humidity, insects and small animals from entering.
Protect the extension joints of the motor cable  and encoder cable, by 
using junction boxes with a protection rating of IP 67 or higher.
The total length of the BUS cables must not exceed 100 m.
It is recommended to install a flashing light in a visible position to 
indicate gate movement.
The control accessories must be positioned in areas that are not 
hazardous to the user and are also accessible with open leaf.
It is recommended to place the control accessories within the automa-
tion's visual range.  This is mandatory with "dead man" control.
If an emergency stop button is installed, it must comply with EN13850.
Comply with the following heights from the ground:
- control accessories = minimum 150 cm
- emergency buttons = maximum 120 cm

4.3 TYPICAL SYSTEM

6

 indicates the installation layout of a typical system.

Summary of Contents for S800 ENC

Page 1: ...S800 ENC...

Page 2: ...cit s sont la propri t de leurs fabricants respectifs Les clients peuvent faire des copies pour leur usage exclusif Ce manuel a t publi en 2016 Copyright FAAC S p A ab dem 2016 Alle Rechte vorbehalte...

Page 3: ...maynotbecom missioneduntilthefinalmachine intowhichitwillbeincorporated hasbeendeclared complaintwiththeprovisionsoftheabovementionedMachineDirective2006 42 EC Bologna 01 01 2016 CEO ANNEX 1 The limit...

Page 4: ...tions The results of the risk assessment conducted by FAAC S p A on the entire life cycle of the product has been considered when drafting the manual in order to implement effective risk reduction The...

Page 5: ...e automation components Do not modify the original components in any way Close off the work site even temporarily and prevent access tran sit EC countries must comply with the legislation that transpo...

Page 6: ...4 Positive stop fastenings 5 Instruction manual Followtheinstructionsonthepackage while handling it Use the forklift truck or pallet truck in observance of the safety rules to avoid risks of collisio...

Page 7: ...rth It is prohibited to integrate unrelated commercial systems and or equipment or employ them for uses that are not allowed by the respective manufacturers It is prohibited to use and or install acce...

Page 8: ...uce the maximum stroke maximum reduc tion 30 for opening and 30 for closing The limits of use of the positive stops in relation to the length and weight of the leaf are described in detail in 2 FAAC C...

Page 9: ...ler cap 7 By pass screws force adjustment 8 Service release lever 9 Positive stop fastenings 10 Installation support 11 Key INSTALLATION ACCESSORIES SUPPLIED SEPARATELY Foundation box 12 Cover 13 Remo...

Page 10: ...ng and closing stops to limit the leaf stroke The stops must be adequately sized and firmly secured to withstand the impact of the leaf The external mechanical stops are not required when using positi...

Page 11: ...he risk of electrocution Ensure there are no pipes near the excavations and drilling areas The electronic board must be housed in an enclosure which guarantees minimum IP 44 protection The board enclo...

Page 12: ...CTIVE EQUIPMENT Anchor the leaf to the lifting device with a rope or a suitable chain After removing the leaf place it on the ground or anchor it with a rope or chain to prevent it from tipping over 5...

Page 13: ...1 2 Position the grooved joint 8 2 Thenotchonthejointmustbecentredwiththecentrelineofthebracket and directed as shown in the figure When the bracket is placed on the box the joint must be centred on t...

Page 14: ...he service lever by more than one turn so as to prevent oil from leaking 4 Insertthespannerinthepinion 12 2 androtatethepinionuntil it stops in the closing direction of the leaf Then move it back appr...

Page 15: ...chieve the required tightening torque 15 6 11 Open and close the leaf manually to ensure it can be fully opened and closed manually If not ensure that all of the installation steps have been carried o...

Page 16: ...eaf movement screw B adjusts the force of anticlockwise leaf movement tighten to increase the force loosen to decrease the force 3 Set the protective caps back in place 17 1 CLOSURE OF THE BOX Close t...

Page 17: ...procedure until non emulsified oil comes out 6 Set the protective caps back in place 19 1 TOPPING UP THE OIL LEVEL 1 Remove the cap 19 3 Check the oil level it should be just below the cap 2 Top up if...

Page 18: ...tronic board enclosure 12 Checktheintegrityofthepowerandconnectioncablesandofthecableglands Check the integrity of the connectors and of the wiring 12 Checkthattherearenosignsofoverheating burns etc o...

Page 19: ...he lock 20 1 2 Insert the key and turn it one anti clockwise turn until it stops 20 2 then move the gate manually RESTORING AUTOMATIC OPERATION 1 Turn the key by one clockwise turn until it stops 20 3...

Page 20: ...ame of the wind Beaufort scale Wind speed km h 0 Calm 1 1 Light air 1 6 2 Light breeze 6 11 3 Gentle breeze 11 19 4 Moderate breeze 19 29 5 Fresh breeze 29 39 6 Strong breeze 39 50 7 Near gale 50 62 8...

Page 21: ...1 10 POS 11 1 10 POS 2 5 8 POS 3 5 8 POS 1 POS 3 POS 2 POS 6 POS 7 POS 11 POS 11 POS 4 POS 12 POS 5 POS 12 POS 8 POS 9 POS 9 POS 11 1 10 POS 9 2 10 POS 12 1 10 Translation of the original instruction...

Page 22: ...S800 ENC 20 532116 Rev A...

Page 23: ...S800 ENC 21 532116 Rev A...

Page 24: ...FAAC S p A Soc Unipersonale Via Calari 10 40069 Zola Predosa BOLOGNA ITALY Tel 39 051 61724 Fax 39 051 758518 www faac it www faacgroup com S800 ENC 22 532116 Rev A...

Reviews: