background image

15

These instructions apply to the following models:

MASTER-T AND SLAVE-T CONTROL BOARDS FOR DOMO SWING AUTOMATED SYSTEMS

The DOMO automated system consists of non-reversing electro-mechanical operators, powered by 12 Vdc, through toroidal
transformer and power supply board; each coupled to a control board.
The SLAVE-T control board (required on 2-leaf gates only) is controlled by the MASTER-T control board to which all accessories and
pulse generators are connected. The MASTER-T board can be programmed and is used to set the following: function logics, work
times (by self-learning) and pause times, leaf speed, and the sensitivity of the anti-crushing device.

The DOMO automated system was designed and built for controlling vehicle access. Do not use for any other purpose.

DOMO MASTER-T - SLAVE-T CONTROL BOARD

1.

DESCRIPTION

Fig. 1

a

Control board

b

Board support

c

Power unit board

d

Toroidal transformer

e

Terminal board (MASTER-T only)

f

Enclosure in class IP 55

2.

DIMENSIONS

Fig. 2

• 

Dimensions in mm

CONTROL BOARD

ENCLOSURE

5.

MASTER-T AND SLAVE-T BOARDS COMMON
TECHNICAL SPECIFICATIONS

Power supply Vac

230 (+6% -10%) ~ 50/60Hz

Use frequency (cycles/hour)

15

(1)

Consecutive cycles

30

(1)

Recovery time

2' for each completed cycle

(1)

Enclosure protection class

IP 55

Transformer power

180 VA

Motor max current

15A

Operating ambient temperature

-20°C ÷ +55°C

Protection fuses

 1 fuse 20A

Anti-crushing function

Encoder - Current control

4.     SLAVE-T BOARD TECHNICAL SPECIFICATIONS

Terminal board outputs

Motor

Terminal board inputs

Power Supply Unit - Bus

3.     MASTER-T BOARD TECHNICAL SPECIFICATIONS

Accessories max. load at 24 Vdc

150 mA

Rapid connector max load

50 mA

Function logics

   Automatic / “Stepped” automatic / Safety

device/ “Stepped” semi-automatic

Opening/closing time

By self-learning

Pause time

Programmable: 5, 10, 20, 30 sec.

Opening and closing leaf delay time

(op 0s, cl 0s) - (op 2s, cl 2s) - (op 2s, cl 4s) - (op 2s, cl 8s)

Speed

Selectable on 4 levels

Static force adjustment

Selectable on 4 levels

Terminal board inputs

 Power Supply Unit -

Open - Free leaf open - Stop - Op. safety devices - Cl. safety
devices

Terminal board outputs             

Flashing lamp - Motor - Bus -

indicator-light - Accessories 24 Vdc - 12 Vdc power supply

Rapid connector

Decoder / minidec / RP cards

Programmable functions

Logic - pause time  - leaf  opening

and closing delay - anti-crushing force  - operators speed

(1)

The 15 cycles/hour are just a reference value for maintaining full
efficiency of motorisation. 30 consecutive cycles can be performed
with software thermal protection. Recovery time is 2' each cycle
performed.

Summary of Contents for MASTER-T

Page 1: ...TER T SLAVE T carta riciclata 100 per la natura for nature recycled paper 100 ist umweltfreundlich 100 Altpapier para la naturaleza 100 papel reciclado papier recycl 100 pour la nature voor de natuur...

Page 2: ...atmayoccurduringuse 10 TheinstallationmustconformtoStandardsEN12453andEN12445 Fornon EUcountries toobtainanadequatelevelofsafety theStandards mentionedabovemustbeobserved inadditiontonationallegalregu...

Page 3: ...ve cycles 30 1 Recovery time 2 for each completed cycle 1 Enclosure protection class IP 55 Transformer power 180 VA Motor max current 15A Operating ambient temperature 20 C 55 C Protection fuses 1 fus...

Page 4: ...2 Vdc flashing lamp Fig 4 Differential thermal breaker Notes 1 To lay electric cables use adequate rigid and or flexible tubes 2 To avoid any kind of interference always separate low voltage connectio...

Page 5: ...accessories and pulse generators will be connected and the SLAVE T units near the DOMO operators using 4 expansion bolts and their fixing screws Route the electric cables to the bottom of the box usi...

Page 6: ...J4 J2 F1 J6 P1 Programming push button Function P2 Programming push button Value F1 Battery and motor fuse F20A J1 Accessories terminal board J2 Not used J3 Motor connection terminal board J4 Connect...

Page 7: ...lock command Device with NC contact 1 4 FSW OP Opening safety devices contact Photocells e g SAFEBEAM 1 5 FSW CL Closing safety devices contact Photocells e g SAFEBEAM 1 6 BUS MASTER T SLAVE T connect...

Page 8: ...act have the same function they must be connected to each other in series Fig 10 Connection of 2 NA contacts in parallel Fig 11 N B If two devices with NA contact have the same function theymustbeconn...

Page 9: ...sh button P1 commands an OPEN A Whencheckshavefinished onceagainpresspush buttonP2to exit the inputs status function LED status Steady light Slow flashing lights every second Rapid flashing lights eve...

Page 10: ...automatic A2 safety A3 Stepped automatic A4 Stepped semi automatic default Press push button P1 again and LED B will light together with LED 1 12 4 3 Pause Times Press push button P2 for a choice of4...

Page 11: ...ht Make sure that the gate is closed and operatorslocked 12 4 8 Complete learning Ifyoupresspush buttonP2formorethan 3 seconds leaf 1 begins to move You can command the following functions with subseq...

Page 12: ...ries 12 5 Status of indicator light If you wish to use a 12V 0 5W indicator light terminal 9 11 of J1 seeFig 8 thefollowingtableshowsthestatusesoftheindicator light according to gate position Tab 4 St...

Page 13: ...ING SAFETY DEVICES STOP PULSES Table 5 c CLOSED Opens leaf ves and re closes after pause time No effect OPEN disabled No effect OPENING Reloads pause time Immediately reverses to open No effect Stops...

Page 14: ...the system is operating correctly and if necessary replace the faulty radio control Automated systemshut down Moves only by key operated command Faulty receiver card If the automated system is still...

Page 15: ......

Page 16: ...ppen van de apparaat gehandhaafd blijven zonder zich daardoor te verplichten deze publicatie bij te werken Timbro del Rivenditore Distributor s Stamp Timbre de l Agent Fachh ndlerstempel Sello del Rev...

Reviews: