![background image](http://html1.mh-extra.com/html/faac/940smt/940smt_manual_4580450017.webp)
16
ENGLISH
ENGLISH
R
20
40
40
5
0
Fig. 35
15.
INSTALLATION OF BUFFER BATTERIES
Install the buffer batteries support on the support profile, using
the supplied plates and screws (fig. 39).
Fig. 39
Fig. 36
Fig. 37
14.
INSTALLATION OF CABLE SLEEVES
Fit the supplied cable sleeves parallel to the profile ( fig. 38 ref.
)and then turn them by 90° to secure them (fig. 38 ref.
).
Fig. 38
•Lay the housing on the spacers.
•To keep the housing open, lift it and push it toward the
profile until the metal projection fits into the profile seat (fig.35
ref.
).
•Fasten the 'parachute' cables on the housing and on the
housing fixing brackets as shown in fig. 35 ref.
).
•The housing is secured on the brackets with the appropriate
hooks (fig. 36).
•Break off the excess lower housing profile with a pair of pliers
(fig. 36 rif.
).
N.B.: To ensure correct closure of the housing, if using the
internal release, shape the housing to the dimensions in fig. 37.
13.
FITTING THE HOUSING
•Fit three spacers (fig. 34 ref.
)on the outer edge of the support
profile, positioning them at the ends and at the centre.
Fig. 34