background image

 

14

Install the 450 MPS  
Control Panel 

Locate the control panel in the most convenient 
position possible, considering the movement of the 
gate. For example, a good position for the control 
panel box is on the inner face of the post or pillar. 
Figure 12 shows the typical layout for a two-leaf gate 
with two 412 Operators.  
 
Installing the control panel consists of the following 
general steps: 

• 

Connecting the main power to the control 
panel 

• 

Connecting an activating device 

• 

Connecting the operator(s) to the control 
panel 

• 

Checking the motor’s direction of rotation 

• 

Connecting other devices (activating and 
reversing) to the control panel 

The installer is responsible for grounding the operator 
systems, for providing the main power breaker switch, 
and for making sure that the entire gate system meets 
all applicable electrical codes. 

Connect the Main Power Supply 

WARNING

! Turn the main power off before 

you make any electrical connections or set 
any switches inside the control panel box. 

WARNING

! The voltage of the main power 

must match the required voltage of the 412 
Operator and the 450 MPS control panel. 

Wire the main power supply to control panel terminals 
in block J1 (see Figures 13 and 14). The installer is 
responsible for insuring that a separate, grounded 
circuit protected by a circuit breaker is between the 
control panel and the main power supply. All wiring 
should conform to applicable electrical codes, and all 
wiring and fittings should be weatherproof and/or 
suitable for burial. 
 
Connect the ground to the grounding terminal in block 
J1 and connect the power wires to the terminals 
labeled N (neutral) and L (phase). 

Caution

: The operators are grounded only by 

the grounded circuit the installer provides. 

C

D

A

B

A

B

 

Gate Elements 

Wire Gauges for Given Voltage 

1 412 

Operators: 

Note: Each requires a junction box 

× 

18 AWG for accessories 

2 Photocells 

B 4 

× 

14 AWG for the operators 

450 MPS control panel and enclosure 

× 

18 AWG for the activating devices 

Operation switch (2 or 3 button) 

× 

14 AWG up to 410 ft for the main power 

5 Radio 

receiver 

 

6 Warning 

light 

 

 

 

Figure 12. The layout of a sample gate system 

Locate switches at least 
10 ft from the gate 

Summary of Contents for 412 Compact

Page 1: ...ate Leaf 10 Attach the Rear Mounting Bracket 10 Attach the Operator to the Rear Mounting Bracket 12 Attach the Operator to the Front Mounting Bracket 12 Attach the Front Mounting Bracket to the Gate L...

Page 2: ...ortant that you locate the gate far enough away from the road to eliminate the potential of traffic getting backed up This distance is affected by the size of the gate how often it is used and how fas...

Page 3: ...al equipment observe some fundamental rules Do not touch the equipment with damp or humid hands or feet Do not install or operate the equipment with bare feet Do not allow small children or incapable...

Page 4: ...may affect duty cycle 4 The 90 deg opening time for a gate with the 412 Operator is a maximum of about 46 sec Note that both the mounting dimensions and the torque adjustment help to determine the pr...

Page 5: ...is marked SX and one is marked DX Be sure to install each on the proper gate leaf see Figure 2 2 Protective covers for the worm screw housing of the operator 1 Package of mounting hardware 2 Rear mou...

Page 6: ...on the single phase bidirectional motor shuts off automatically if its operating temperature reaches 284 deg F 140 deg C Also for the protection and proper operation of the 412 Operator each gate leaf...

Page 7: ...e 450 MPS control panel are briefly described below You can find a complete description of each logic in the tables on the following pages A automatic The gate opens on command and automatically close...

Page 8: ...them after pause time Opens single leaf connected to Motor 1 and closes it after pause time No effect No effect No effect Off Opening Closes both leaves immediately Closes the leaf immediately Stops S...

Page 9: ...1 No effect opening is inhibited No effect opening is inhibited No effect opening is inhibited Off Opening Stops Stops Stops Stops gate closes when reversing device no longer triggered No effect On O...

Page 10: ...Installing the operator consists of the following steps Establishing the orientation of each gate leaf and its operator Attaching the rear mounting bracket Attaching the operator to the rear mounting...

Page 11: ...acket see Figure 6 The recessed liner should be constructed of 3 16 or 1 4 in steel with a minimum interior height of 11 13 16 in 30 cm so as to allow you to meet the required dimensions shown in Figu...

Page 12: ...gate installation Inward swinging Lengthen the worm screw completely and push the cylinder in one inch Outward swinging Shorten the worm screw completely and then pull the cylinder out one inch With t...

Page 13: ...unting plate to the center of the front mounting hole on the operator Figure 9 Secure the operator to the front mounting bracket with the short pin and 2 snap rings dimensions are incorrect see Figure...

Page 14: ...WARNING The voltage of the main power must match the required voltage of the 412 Operator and the 450 MPS control panel Wire the main power supply to control panel terminals in block J1 see Figures 13...

Page 15: ...the control panel enclosure For the purposes of installation you need to connect at least one normally open N O activating device for your operator s If you have a two leaf gate design connect the ac...

Page 16: ...Listed cord grip Junction box Op 1 Op 2 1 2 3 4 5 6 7 8 OP COM CL CL COM OP Lamp Motor 1 Motor 2 J1 J2 High voltage terminal strip 450 MPS Control Panel U L Listed Control Panel Enclosure Cord grip or...

Page 17: ...tially dangerous Do not place yourself within the path of the moving gate during your test Disengage the operator s with the Manual Release key and open the gate by hand about halfway Next engage the...

Page 18: ...on terminal block J3 requires a fail safe connection for the photocells Connect the photocells to terminals 20 and 21 in the FSWTX grouping Activating Devices and Radio Receiver The acti vating device...

Page 19: ...button you must install a circuit between these terminals for the control panel to work The LED Indicators The five light emitting diodes LEDs on the control panel can be used to check for the proper...

Page 20: ...ol Panel has 5 DIP switches and 4 potentiometers that control a wide range of functions Set DIP Switches Switches 1 2 and 3 Operating Logic The 450 MPS Control Panel offers six operating modes A S E E...

Page 21: ...5 sec Note You cannot adjust this opening delay of the operator connected to Motor 2 However you can avoid the opening delay and closing delay by connecting both operators and their capacitors to Mot...

Page 22: ...k J3 Check the LED DL1 for a two leaf gate or DL2 for a one leaf gate One of them should turn on when you signal the gate to open or to close If neither one illuminates then check the wiring for the a...

Page 23: ...negligence or accident or has not been operated in accordance with FAAC International Inc s or FAAC S p A s instructions or has been operated under conditions more severe than or otherwise exceeding...

Reviews: