The 412 Compact Operator 

General Characteristics 

The FAAC 412 Compact Operator is an automatic gate 
operator for a swinging gate leaf. The 412 Compact 
Operator is useful in apartment and other residential 
applications and can accommodate a gate leaf up to 14 
ft (4.3 m) long.  

The self-contained 412 Compact Operator consists of an 
electric motor that drives a worm screw housed in an 
aluminum casing.  

The locking the 412 Operator provides in the fully 
opened and fully closed positions is a service device 
rather than a security device. Additional, external locks 
are recommended under the following conditions: 

• 

Yours is a solid-faced gate. 

• 

The length of the gate leaf is 6 ft (2 m) or 
longer. 

• 

The installation requires tight security. 

• 

The site is subject to vandalism. 

• 

The site is subject to strong or very gusty wind. 

For gates with two leaves, two operators are installed. 
Each of them is designed for either the right or left gate 
leaf: If the hinge is on the left as you face the gate on 
the side where the operator will be installed, you want a 
left or SX version; if the hinge is on the right when you 
face the gate on the side where the operator will be 
installed, you want a right or DX version. A kit has one 
right and one left version. 

In two-operator gate installations, both operators are 
wired to one control panel. In such gate installations, 
one leaf can be wired and programmed to close slightly 
later than the other leaf to accommodate overlapping 
gate designs. 

The 450 MPS electronic control panel is a 
microprocessor-based controller that accepts a wide 
range of product accessories and reversing devices, thus 
allowing for flexible gate system design. The control 
panel sets the closing leaf delay, the opening/closing 
time, the pause time, the torque, the operating logic of 
the gate system, the function of the reversing stroke 
(required for some electric locks), and the behavior of 
triggered reversing devices during the closing phase. 

For its protection, the single-phase, bidirectional motor 
shuts off automatically if its operating temperature 
reaches 284 deg F (140 deg C). Also for the protection 
and proper operation of the 412 Operator, each gate leaf 
on which it is installed must have a fixed positive stop 
in both the opened and closed positions. 

Built-in security and anti-crushing measures of the 412 
Operator include a key-operated Manual Release 

mechanism and a torque adjustment mechanism that 
precisely controls the force transmitted to the gate leaf 
through the 412 Operator. 

The Manual Release mechanism is a key-operated 
device that disengages (or engages) the worm screw 
drive of the 412 Operator. When the drive is 
disengaged, you can open and close the gate leaf by 
hand. Such manual operation of the gate is necessary 
during installation and useful during power failures. 

The torque of the 412 Operator is controlled by a 
potentiometer located on the 450 MPS control panel. 
FAAC recommends that the gate leaf stop if it 
encounters a force of more than about 33 lb (15 kg). 

Reversing devices (such as inductive loops and 
photocells) should be installed to provide non-contact 
reversing operation. 

Operating Logic 

The 412 Operator provides a Manual Release 
mechanism for manually operating the gate. Manual 
operation of the gate requires using a special key. The 
450 MPS Control Panel provides logical operating 
modes set on the control panel. 

Manual Release Mechanism 

The Manual Release mechanism is a built-in release 
device of the 412 Operator (see Figure 3). To access the 
keyhole, remove the plug on the top of the motor 
housing. Then insert the key and turn it a half turn in the 
direction of the gate’s closing to disengage the 
operator’s motorized operation. You can now move the 
gate leaf by hand to open or close the gate. Operating 
the gate leaf by hand is necessary during installation 
and is useful during power failures. 

Remove the plug 
on the top of the 
motor housing

1.

Insert the Manual Release
key and turn it in the 

closing

2.

 

Figure 3. Use the Manual Release key to 
disengage the 412 Operator from its motor so 
that you can move the gate leaf by hand in 
the opening or closing direction 

 

Summary of Contents for 412 Compact

Page 1: ...ate Leaf 10 Attach the Rear Mounting Bracket 10 Attach the Operator to the Rear Mounting Bracket 12 Attach the Operator to the Front Mounting Bracket 12 Attach the Front Mounting Bracket to the Gate L...

Page 2: ...ortant that you locate the gate far enough away from the road to eliminate the potential of traffic getting backed up This distance is affected by the size of the gate how often it is used and how fas...

Page 3: ...al equipment observe some fundamental rules Do not touch the equipment with damp or humid hands or feet Do not install or operate the equipment with bare feet Do not allow small children or incapable...

Page 4: ...may affect duty cycle 4 The 90 deg opening time for a gate with the 412 Operator is a maximum of about 46 sec Note that both the mounting dimensions and the torque adjustment help to determine the pr...

Page 5: ...is marked SX and one is marked DX Be sure to install each on the proper gate leaf see Figure 2 2 Protective covers for the worm screw housing of the operator 1 Package of mounting hardware 2 Rear mou...

Page 6: ...on the single phase bidirectional motor shuts off automatically if its operating temperature reaches 284 deg F 140 deg C Also for the protection and proper operation of the 412 Operator each gate leaf...

Page 7: ...e 450 MPS control panel are briefly described below You can find a complete description of each logic in the tables on the following pages A automatic The gate opens on command and automatically close...

Page 8: ...them after pause time Opens single leaf connected to Motor 1 and closes it after pause time No effect No effect No effect Off Opening Closes both leaves immediately Closes the leaf immediately Stops S...

Page 9: ...1 No effect opening is inhibited No effect opening is inhibited No effect opening is inhibited Off Opening Stops Stops Stops Stops gate closes when reversing device no longer triggered No effect On O...

Page 10: ...Installing the operator consists of the following steps Establishing the orientation of each gate leaf and its operator Attaching the rear mounting bracket Attaching the operator to the rear mounting...

Page 11: ...acket see Figure 6 The recessed liner should be constructed of 3 16 or 1 4 in steel with a minimum interior height of 11 13 16 in 30 cm so as to allow you to meet the required dimensions shown in Figu...

Page 12: ...gate installation Inward swinging Lengthen the worm screw completely and push the cylinder in one inch Outward swinging Shorten the worm screw completely and then pull the cylinder out one inch With t...

Page 13: ...unting plate to the center of the front mounting hole on the operator Figure 9 Secure the operator to the front mounting bracket with the short pin and 2 snap rings dimensions are incorrect see Figure...

Page 14: ...WARNING The voltage of the main power must match the required voltage of the 412 Operator and the 450 MPS control panel Wire the main power supply to control panel terminals in block J1 see Figures 13...

Page 15: ...the control panel enclosure For the purposes of installation you need to connect at least one normally open N O activating device for your operator s If you have a two leaf gate design connect the ac...

Page 16: ...Listed cord grip Junction box Op 1 Op 2 1 2 3 4 5 6 7 8 OP COM CL CL COM OP Lamp Motor 1 Motor 2 J1 J2 High voltage terminal strip 450 MPS Control Panel U L Listed Control Panel Enclosure Cord grip or...

Page 17: ...tially dangerous Do not place yourself within the path of the moving gate during your test Disengage the operator s with the Manual Release key and open the gate by hand about halfway Next engage the...

Page 18: ...on terminal block J3 requires a fail safe connection for the photocells Connect the photocells to terminals 20 and 21 in the FSWTX grouping Activating Devices and Radio Receiver The acti vating device...

Page 19: ...button you must install a circuit between these terminals for the control panel to work The LED Indicators The five light emitting diodes LEDs on the control panel can be used to check for the proper...

Page 20: ...ol Panel has 5 DIP switches and 4 potentiometers that control a wide range of functions Set DIP Switches Switches 1 2 and 3 Operating Logic The 450 MPS Control Panel offers six operating modes A S E E...

Page 21: ...5 sec Note You cannot adjust this opening delay of the operator connected to Motor 2 However you can avoid the opening delay and closing delay by connecting both operators and their capacitors to Mot...

Page 22: ...k J3 Check the LED DL1 for a two leaf gate or DL2 for a one leaf gate One of them should turn on when you signal the gate to open or to close If neither one illuminates then check the wiring for the a...

Page 23: ...negligence or accident or has not been operated in accordance with FAAC International Inc s or FAAC S p A s instructions or has been operated under conditions more severe than or otherwise exceeding...

Reviews: