
15
1
J1 terminal block for main power supply
8
Leaf delay potentiometer
2
J2 terminal block for connecting the operator(s) 9
DIP switch assembly
3
J3 terminal block for low-voltage accessories
Fuses
220 VAC 115 VAC
4
J4 quick connector port
10
F1, Main power
5 A
10 A
5
Pressure adjustment potentiometer
11
F2, Accessories
800 mA
800
mA
6
Pause time potentiometer
12
F3, Electric lock
1.6 A
1.6 A
7
Potentiometer for adjusting open/close time
13
F4, Microprocessor
250 mA
250 mA
Figure 13. The 450 MPS control panel
Connect One Activating Device
WARNING
! Turn the main power off before
you make any electrical connections or set any
switches inside the control panel enclosure.
For the purposes of installation you need to connect at
least one normally open (N.O.) activating device for
your operator(s).
•
If you have a two-leaf gate design,
connect the activating device to terminals
18 and 19.
•
If you have a one-leaf gate design, connect
the activating device to terminals 16 and
17.
You use this activating device in the rest of the
installation process. You can connect additional
activating devices later.
Connect the Operator(s) to
the Control Panel
WARNING
! Turn the main power off before
you make any electrical connections or set any
switches inside the control panel box.
Using a Junction Box
Connecting your operator(s) to the control panel may
require the use of one or more junction boxes. Whether
you need 0, 1, or 2 U.L. Listed junction boxes depends
on your gate design (refer to Figure 15 below).