2) Remove the evaporating tube from the main unit
evaporating tube installation part.
*Remove the outlet temperature sensor beforehand
from the sensor installation port on the branched
tube of the evaporating tube.
3) Disassemble and wash respective parts as
illustrated in the right figure.
*Use a neutral detergent to wash glass parts.
If they are dirty, immerse them in a neutral
detergent-diluted solution for about half a day
before washing them.
4) Assemble parts by reversing procedure.
Evaporating tube
mounting portion
Evaporator
Evaporating tube
receiving cradle
③
Pull out
②
Rotate
Rectification board
Evaporator
Cyclone
Separable seal packing
Packing (SC)
Connecting tube
Separable clamp (
φ
75)
Code No.
Part name
Remarks
180370
Rectification board
180000
Evaporator
147840
Upper connection packing
146760
Collecting flask cap
199050
Lower connecting packing
146750
Separator, powder
collection container
116510
Separable clamp (
φ
75)
180020
Connecting tube
116530
Separable seal packing
180010
Cyclone
180190
Packing (SC)
-32-
①
Loosen
Upper connecting packing
Powder collection container
Separator
Lower
connecting
packing
Collecting flask
Cap