Preparing AAP Modules
If required, AAPs must be purchased separately. Go to
www.extron.com
to see the full range of
AAPs that are available.
1.
Secure up to three single space AAPs in the AAP Frame, using the #4-40 nut with captive
washer provided with the AAP (figure 8,
1
).
If required, fill any unused spaces with blank AAP plates.
3
2
#4-40 Nut with
Captive Washer
1
AAP
AAP Frame
Connectivity
Module
3
3
3
3
Figure 7.
Preparing AAP Modules
2.
Insert cables through the bottom of the connectivity module and connect them to the
bottom of the AAPs (
2
).
3.
Secure the AAP frame to the connectivity module, using the four provided #4-40 screws
(
3
).
4.
Insert the AAP module assembly into the Cable Cubby (see
Installing Modules
on the next
page).
Preparing Pass-through Cable Modules
3
2
1
4
Figure 8.
Preparing Pass-through Cable Modules
1.
Pass the cables through the connectivity module from the bottom (see figure 8,
1
).
2.
Insert the cable into the grommet plate (
2
).
3.
Fill any unused holes with the provided plugs (
3
).
4.
Attach the grommet plate to the top of the connectivity module, using four of the provided
#4-40 screws (
4
).
5.
Insert the cable pass-through modules into the Cable Cubby (see
Installing Modules
on
the next page).
TLP Pro 725C Series Touchpanels • Mounting
11