Managing cables
The minimum radius that a 50 micron cable can be bent under full tensile load is 5.1 cm (2 in.). For a cable under no tensile load, that
minimum is 3.0 cm (1.2 in.). Cables can be organized and managed in a variety of ways, for example, using cable channels on the sides
of the rack or patch panels to minimize cable management. Following is a list of additonal recommendations:
•
Plan for rack space required for cable management before installing the device.
•
Leave at least 1 m (3.28 ft) of slack for each port cable. This provides room to remove and replace the device, allows for
inadvertent movement of the rack, and helps prevent the cables from being bent to less than the minimum bend radius.
•
For easier maintenance, label the fiber-optic cables and record the devices to which they are connected.
•
Keep LEDs visible by routing port cables and other cables away from the LEDs.
•
Do not route the cables in front of air vents.
•
Use Velcro
®
type straps to secure and organize fiber-optic cables.
•
Route the cables away from LEDs to keep them visible.
•
Use the cable management comb that attaches to the chassis for simple cable management. The comb can be installed without
service disruption.
CAUTION
Before plugging a cable into any port, be sure to discharge the voltage stored on the cable by touching the electrical
contacts to ground surface.
NOTE
Do not use tie wraps with optical cables because they are easily overtightened and can damage the optic
fibers.
Installing an SFP+ transceiver
While non-Extreme optics are supported,Extreme-qualified transceivers are recommended. The port might not become operational
using unqualified transceivers.
To insert an SFP+ transceiver, complete the following steps.
NOTE
Route cables to the side so that the line cards can be removed without disturbing the cables to the other line cards.
Installing an SFP+ transceiver
ExtremeSwitching SLX 9030 Hardware Installation Guide
9035691-02 Rev AD
67
Summary of Contents for EN-SLX-9030-48S-4C
Page 6: ...ExtremeSwitching SLX 9030 Hardware Installation Guide 6 9035691 02 Rev AD...
Page 10: ...ExtremeSwitching SLX 9030 Hardware Installation Guide 10 9035691 02 Rev AD...
Page 64: ...ExtremeSwitching SLX 9030 Hardware Installation Guide 64 9035691 02 Rev AD...
Page 76: ...ExtremeSwitching SLX 9030 Hardware Installation Guide 76 9035691 02 Rev AD...
Page 82: ...ExtremeSwitching SLX 9030 Hardware Installation Guide 82 9035691 02 Rev AD...
Page 96: ...ExtremeSwitching SLX 9030 Hardware Installation Guide 96 9035691 02 Rev AD...