Exalt Installation and Management Guide
EX-i Series FDD Digital Microwave Radios
202675-005
11
2011-08-30
System Installation and Initiation Process
The tasks required for radio installation and initiation are outlined in the following figure.
Figure 4 Radio installation tasks
Path & Site
Analysis
Link Design
Build Antenna
Structures &
Egress
Mount
Antennas &
Transmission
Line
Install & Test
Network &
Power Wiring
Read This
Manual
Completely
Pre-configure
Radios
Perform
Back-to-Back
Test
Mount Radios
Connect
Transmission
Line
Connect
Power
Align
Antennas to
Planned RSL
Verify LEDs
for Good Link
Test Network
Connectivity
Connect &
Test Primary
Services
Test Network
Management
System
Both Transmission
System & Radio
Preparation Tasks
Must Be Complete
Transmission System Tasks
Radio Preparation Tasks
Summary of Contents for EX i GigE Series
Page 133: ...202675 005 2011 08 30...