Filling electrode cleaning sand
The electrode cleaning sand (part no. W3T158743) is supplied in
a plastic bottle, the cap of which serves as a measuring beaker.
Proceed as follows:
1
Close the shut-off ball valve on the sample water inlet.
2
On the pressurized version, close the shut-off ball valve on the
sample water outlet.
3
On the non-pressurized version, take out a plug or sensor from
the cell body cover.
4
On the pressurized version, remove the protection cap or sen-
sor on the cell body cover.
5
Fill half a cap from the plastic bottle with cleaning sand and
pour it into the cell body through a sensor mounting hole
(approx. 1/3 cm³ of cell sand).
6
Make sure that the opening and the thread are clean; if neces-
sary rinse with distilled water.
7
Insert the plug or a sensor in the cell body cover.
8
Open the shut-off ball valve at the sample water inlet.
9
On the pressurized version, open the shut-off ball valve on the
sample water outlet.
Summary of Contents for WALLACE & TIERNAN DEPOLOX 5 E
Page 1: ...WALLACE TIERNAN DEPOLOX 5 E FLOW CELL INSTRUCTION MANUAL...
Page 8: ...8 WT 050 810 040 DE IM 0817 Introduction DEPOLOX 5 E flow cell 1...
Page 82: ...82 WT 050 810 040 DE IM 0817 Declarations and certificates DEPOLOX 5 E flow cell 7...
Page 83: ...DEPOLOX 5 E flow cell Declarations and certificates 7 83 7 2 Certificate of CSA...
Page 84: ...84 WT 050 810 040 DE IM 0817 Declarations and certificates DEPOLOX 5 E flow cell 7...
Page 85: ...DEPOLOX 5 E flow cell Declarations and certificates 7 85...
Page 86: ...86 WT 050 810 040 DE IM 0817 Declarations and certificates DEPOLOX 5 E flow cell 7...
Page 90: ...90 WT 050 810 040 DE IM 0817 Index DEPOLOX 5 E flow cell 8...