14
www.evolutionsteel.com
ASSEMBLY and PREPARATION
WARNING: This machine must not be connected to
a power source until all assembly and preparation has
been completed and a safety check carried out.
Assembly
Remove the machine from the case and check that all accessories
are present and correct. Place the machine onto a clean, sturdy
work surface.
• Attach the three handles into the spindle boss ensuring that they
are screwed fully home.
(Fig. 1)
• Attach the Safety Guard and secure in place using the supplied
fixing screws.
(Fig. 2)
• The coolant system should be fastened to the machine
using the ø 6 mm (1/4”) socket headed screw inserted into
the threaded hole located at the top Left Hand side of the
machines carriage.
(Fig. 3 a)
• Screw the lubrication quick connector into the threaded hole
located just below the motor housing on the left hand side of
the machine.
(Fig. 3b)
• Insert the free end of the delivery pipe into the quick connector.
Note:
To release the delivery pipe from the quick connector push
the collar towards the brass union and withdraw the delivery pipe
Note:
For some operations it may be convenient to remove
the coolant tank and supply pipe, and to use alternative coolant
application methods.
OPERATING INSTRUCTIONS
TESTING
WARNING:
This machine has CLASS 1 insulation and
MUST be earthed. Any power socket that this machine
is connected to must be grounded to earth. Ensure that both
operating switches are in the ‘OFF’ position before connecting the
power cord to the socket.
WARNING:
The power cord assembly is a custom terminated
one. Replacement should only be carried out by a qualified
technician. Only use replacement parts recommended by Evolution
Power Tools.
• Place the machine onto a piece of clean 10 mm thick Mild Steel
plate that is larger than the magnetic base of the machine.
• Connect the 13A plug into a 13A mains supply socket
(UK Only).
• Switch on the socket.
Fig. 1
Fig. 2
Fig. 3
b
a