23
2.8
Final Install Process
Once you have completed the basic wiring installation and the hard disk drive installation you are
ready to turn on the DVR. Simply plug in the power source and turn the switch to the on position. The
POWER LED lights will light up if power is normal. Once the system has finished loading, the next
step is to set up the menu options for the DVR.
Diagram 2.11shows 3.5“ Hard Drive
Summary of Contents for 920
Page 1: ...Instruction Manual E ED DR R1 16 64 40 0 1 16 62 20 0 9 92 20 0 ...
Page 99: ...89 ...
Page 100: ...90 ...
Page 101: ...91 ...
Page 104: ...94 ...
Page 138: ...128 CAMERA setup menu RECORD setup menu ALARM setup menu ...
Page 141: ...131 SCHEDULE setup menu CONTROL setup menu ...
Page 153: ...143 AppendixC AlarmBoardConfiguration Appendix C ...