3
13
12
Starting the filling process
Press
to start filling the reservoir.
The device pumps the drug from the
vial into the reservoir. This process
takes a few minutes. You can follow
the progress on the screen.
Turning the pump
Turn your pump with the vial attached
and place it in the docking station.
The pump must remain upright during
the filling process.
Before you start the filling
process, check the placement
of the adapter on the reservoir in
the pump. To do so, gently turn
the adapter with the vial to the
right (clockwise).
50
Confirming the completion of filling
The pump will notify you with a
signal as soon as the reservoir is full.
Turn the pump over and check in the
viewing window if the level has
reached the uppermost mark, then
press
.
If an error message is displayed
during filling, return to step 3. A
small residual amount will always
remain in the vial.
Observing the filling process
Air bubbles will form in the liquid
during the filling process.
You can observe how the stopper
moves in the reservoir through the
viewing window.
The filling process is complete once
the vial is empty and the stopper is all
the way at the bottom.
Filling reservoir
During the filling process, you can
observe how the drug is pumped out
of the vial and into the reservoir. Filling
the reservoir takes about six minutes.
51
The pump must remain upright
during the entire filling process. If
not, air could get into the reservoir.
Do not remove the vial until the
filling process is completely
finished and confirmed with a
signal.
If the "No vial" or "Incorrect vial"
message appears instead of the
level indicator, then the test of the
vial has detected an error. Return
to Step 6 and repeat the process
with a new vial.
Summary of Contents for Pharma D-mine Pump
Page 1: ...EVER Pharma D mine Pump Instructions for use ...
Page 2: ...WELCOME ...