RELEASE ER2017_06_23
This document is property of Euroscreen Srl.
Any distribution, reproduction, copying or publication of this document is prohibited.
Installation and maintanance manual
Projector lift
Mod. SI - 200
Without removing the polystyrene cubes from the lift structure (in order to keep
tension onto the steel cables), lift up the lift (using proper safety devices) aligning
the brackets with the drilled holes. Mount the lift to the ceiling using the suitable
bolts/screws and wall plugs (NOT SUPPLIED) suitable for the kind of ceiling and
the weight that have to be supported (max ø8).
After having fixed the lift to the ceiling, please remove the polystyrene cubes
from the lift structure.
Remove
adesive tape