Installation and maintanance manual
Projector lift
Mod. SI - 200
This document is property of Euroscreen Srl.
Any distribution, reproduction, copying or publication of this document is prohibited.
4.3
CEILING MOUNTING OF THE PROJECTOR LIFT
Before proceeding with the ceiling mounting, we advice to mark the fixing points
where to fix the ceiling mounting brackets in the most accurate way.
The ceiling has to be clean and flat.
Installing the lift perfectly level is IMPORTANT and ensures silent movement
of the lift without any shaking, jolting or friction that would compromise the
alignment between projector and projection screen.
INSTALLATION OF THIS LIFT HAS TO BE CARRIED
OUT FROM AT LEAST TWO QUALIFIED PERSONS.
Measure centre hole of the brackets as accurate as possible.
Mark these measures onto the ceiling, in the required position, taking care to
keep the squareness between the four points.
Now drill the holes in the ceiling in order to fix the brackets.