3 / 16
4 - ELECTRICAL DIAGRAM FOR INSTALLATION:
Mono-Phase Wiring Diagram:
Three-Phase Wiring Diagram:
Q1 -
The installer has to provide an external disconnection device; this breaker has to be easily reachable and
identified as "disconnection device".
(
**
) -
The value has to be calculated according to the T1 used.
ETI Elektroelement d.d. - Slovenija
Tel.: 03/56-57-570- Fax: 03/56-74-077
www.eti.si - [email protected]