background image

 

 

 

 

 

 

 

 

 

 

BH3-V  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

www.etatronds.com  

 

 

IT 

NORME DI INSTALLAZIONE, USO E MANUTENZIONE 

UK 

OPERATING INSTRUCTIONS AND MAINTENANCE 

FR 

NOTICE D’INSTALLATION, EMPLOI ET ENTRETIEN 

ES 

NORMAS DE INSTALACIÓN, USO Y MANUTENCIÓN 

  

  

  

  

  

  

  

UNI EN ISO 9001-2008  

Summary of Contents for BH3-V

Page 1: ...etatronds com IT NORME DI INSTALLAZIONE USO E MANUTENZIONE UK OPERATING INSTRUCTIONS AND MAINTENANCE FR NOTICE D INSTALLATION EMPLOI ET ENTRETIEN ES NORMAS DE INSTALACI N USO Y MANUTENCI N UNI EN ISO...

Page 2: ......

Page 3: ......

Page 4: ...ther details provides for p unitive actions in case of illeg al disposal of such waste FR DIRECTIVE RAEE 2002 96 CE ET MODIFICATION SUCCESSIVE 2003 108 CE CONCERNANT LES REBUTS D APPAREILLAGES LECTRIQ...

Page 5: ...O TOSSICI 3 1 6 MONTAGGIO E SMONTAGGIO DELLA POMPA 3 2 0 PRINCIPIO DI FUNZIONAMENTO POMPE PERISTALTICHE 4 2 1 CARATTERISTICHE TECNICHE 4 2 2 MATERIALI A CONTATTO CON L ADDITIVO 5 2 3 CORREDO 5 3 0 IN...

Page 6: ...danni derivanti da usi imp ropri erronei ed irragionevoli 1 4 RISCHI Dopo aver tolto l imballaggio assicurarsi dell integrit della pompa in caso di dubbio non utilizzare la pompa e rivolgersi a perso...

Page 7: ...LLA POMPA 1 6 1 MONTAGGIO Tutte le pompe dosatrici da noi prodotte vengono normalmente fornite gi assemblate Per maggiore chiarezza di esposizione si pu consultare l allegato in fondo al manuale dove...

Page 8: ...ressa ritorna nella sua forma originale producendo un aspirazione di fluido in con seguenza della depressione creata Il fluido seguir il rullo finch il tubo non verr pi compresso A questo punto un sec...

Page 9: ...h bar kg lb mm in mm in mm in Watts giri min rpm mm BH3 V 100 1 1 50 3 31 170 6 69 108 4 25 183 7 20 25 150 9 6x15 9 2 2 MATERIALE A CONTATTO CON L ADDITIVO Tubetto di schiacciamento Santoprene Norpr...

Page 10: ...istanza minima tra i con tatti di mm 3 Prima di accedere ai dispositivi di collegamento tutti i c ircuiti di alimentazione debbono esse re interrotti Fig 4 c Ubicare la pompa come in figura 5 tenendo...

Page 11: ...nserita immergere il filtro in una soluzione di acido cloridrico ed attendere che l acido termini la sua azione di pulizia f alimentare di nuovo la pompa facendola lavorare con acido cloridrico per 5...

Page 12: ...8...

Page 13: ...ANGEROUS LIQUID DOSAGE 11 1 6 ASSEMBLING AND DISMANTLING THE PUMP 11 2 0 PERISTALTIC PUMPS OPERATING PRINCIPLES 12 2 1 COMMON FEATURES 12 2 2 MATERIALS IN CONTACT WITH THE ADDITIVE 13 2 3 ACCESSORIES...

Page 14: ...cas e of doubt please contact our offices for further inf ormation about the c haracteristics of the p ump and its proper use The manufactures cannot be held res ponsible for damage deriving f rom imp...

Page 15: ...pump head with the proper reagent liquid 1 6 ASSEMBLING AND DISMANTLING THE PUMP 1 6 1 ASSEMBLY All metering pumps are normally supplied fully assembled For greater clarity please consult the explod e...

Page 16: ...ompressed tube r egains original form and sucks fluid into the formed vacuum The fluid will follow the roller until tube is not compressed any more then to avoid a flow back a second roller compress t...

Page 17: ...h POWER SPEED l h bar kg lb mm in mm in mm in Watts giri min rpm mm BH3 V 100 1 1 50 3 31 170 6 69 108 4 25 183 7 20 25 150 9 6x15 9 2 2 MATERIALS IN CONTACT WITH THE ADDITIVE Hose Santoprene Norprene...

Page 18: ...e supply mains by means of a single pole circuit breaker having a minimum distance o f 3 mm between th e contacts Before accessing any of the electrical parts make sure that all the supply circuits ar...

Page 19: ...t it operate with water for 5 to 10 minutes e switch OFF the pump dip the filter into a hydrochloric acid solution and wait until the a cid finishes cleaning f switch ON the pump again and operate it...

Page 20: ...16...

Page 21: ...6 MONTAGE ET DEMONTAGE DE LA POMPE 19 2 0 PRINCIPE DE FONCTIONNEMENT POMPES PERISTALTIQUES 20 2 1 CARACTERISTIQUES TECHNIQUES 20 2 2 MATERIAUX EN CONTACT AVEC L ADDITIF 21 2 3 FOURNITURE STANDARD 21 3...

Page 22: ...peut t re consid r responsable d ventuels dommages provoqu s par des emplois impropres erron s et irrationnels 1 4 RISQUES Apr s avoir retir l emballage v rifier si la pompe est en bon tat en cas de d...

Page 23: ...1 6 MONTAGE ET DEMONTAGE DE LA POMPE 1 6 1 MONTAGE Toutes les pompes doseuses que nous produisons sont normalement fournies d j assembl es Pour plus de d tails on peut consulter l annexe la fin du ma...

Page 24: ...t et donc la partie d un tube pr c demment comprim e retourne sa forme originale en produisant une aspiration de fluide A ce stade un second rouleau est d j en train de comprimer le tube pour viter un...

Page 25: ...C type cristal transparent flexible de 4 m 1 manuel d instructions PORTATA PRESS MASSIMA MASSIMA DIMENSIONI D INGOMBRO MAX PESO NETTO MAX OVERALL DIMENSIONS POTENZA GIRI MOTORE ASSORBITA MAX MAX FLOW...

Page 26: ...distance m inimum entre les contacts de 3 mm Avant d acc der aux di spositifs de raccordement tous les circuits d alimentation doi vent tre interrompus Dessin 4 c Placer la pompe comme au dessin 4 en...

Page 27: ...ion d acide chlorhydrique et attendre que l acide ter mine son travail de nettoyage f alimenter de nouveau la pompe en la faisant fonctionner pendant 5 minutes avec de l acide chlorhydrique en r alisa...

Page 28: ...24...

Page 29: ...6 MONTAJE Y DESMONTAJE DE LA BOMBA 27 2 0 PRINCIPIO DE FUNCIONAMIENTO DE LA BOMBAS PERIST LTICAS 28 2 1 CARACTER STICAS T CNICAS 28 2 2 MATERIALES EN CONTACTO CON EL ADITIVO 29 2 3 DOTACI N 29 3 0 IN...

Page 30: ...ciones sobre el tipo de bom ba que s e encuentra en s u poder y el uso correcto al cual ha sido destinada El constructor no podr ser considerado responsable por los eventuales da os que deriven de u s...

Page 31: ...e neutralizar la parte hidr ulica con reactivos oportunos 1 6 MONTAJE Y DESMONTAJE DE LA BOMBA 1 6 1 MONTAJE Todas las bombas dosificadoras que producimos se suministran ya montadas Para mayor detalle...

Page 32: ...elve a su form a original produciendo una aspiraci n de fluido por consecuencia de la depresi n que se ha creado El fluido seguir al rodillo hasta que el tubo no vuel va a s er comprimido En este mo m...

Page 33: ...al transparente flexible de 4 m n 1 set de instrucciones n 1 destornillador TIPO PORTATA PRESS MASSIMA MASSIMA DIMENSIONI D INGOMBRO MAX PESO NETTO MAX OVERALL DIMENSIONS POTENZA GIRI MOTORE TUBETTO A...

Page 34: ...tenga una distancia m nima entre los contactos de 3 mm antes de tener acceso a los dispositivos de conexi n todos los circuitos deben estar interrumpidos Fig 4 c Ubicar la bomba como se indica en la...

Page 35: ...r o en u na soluci n de cido clorh drico y esperar que el cido ter mine su acci n de limpieza f Alimentar nuevamente la bom ba haci ndola funcionar con cido clor h drico durante 5 minutos realizando u...

Page 36: ...32...

Page 37: ...VISTE ESPLOSE EXPLODED VIEWS VUES D ENSEMBLE ESQUEMA DE ARMADO 33...

Page 38: ...Hydraulic casing 2 Distanziale Spacer 3 Motoriduttore Gear motor 4 Scheda elettronica di alimentazione Circuit board 5 Cassa posteriore Rear casing 6 Portarullini Rollers holder 7 Tubo di schiacciame...

Page 39: ......

Page 40: ...ATRON FRANCE 1 Mail Gay Lussac 95000 Neuville Sur Oise Tel 33 0 1 34 48 77 15 Fax 33 0 1 78 76 73 95 3 rd Mytishenskaya 16 2 129626 Moscow RUSSIA Phone 7 495 787 1459 Fax 7 495 787 1459 RUSSIAN FEDERA...

Reviews: