ES4441.1 Compact Error Simulation Module with Breakout Frontpanel - User´s guide
26
Introduction
ETAS
27 0xB
Pull up resistor to
+UBATT2 for ECU
pin, load pin is con-
nected
MOS-
FET
No
For this kind of error
both rails will be nee-
ded
28 0xB
Pull up resistor to
+UBATT2 for ECU
pin, load pin discon-
nected
MOS-
FET
No
For this kind of error
both rails will be nee-
ded
29 0xB
Pull down resistor to
–UBATT2 for ECU
pin, load pin is con-
nected
MOS-
FET
No
For this kind of error
both rails will be nee-
ded
30 0xB
Pull down resistor to
–UBATT2 for ECU
pin, load pin is
disconnected
MOS-
FET
No
For this kind of error
both rails will be nee-
ded
31 0x15
Extern connection for
current measurement
Two rails will be nee-
ded. The changeover
must be done without
interrupt of ECU load
line
45 0x24
Ground shift
Possi-
ble
M7 should normally
be closed. To prepare
the error K11 has to
be opened. And the
cascade has to be set.
To activate the error
M7 will open.
At reset, over temp.
or over current vice
versa.
This error can be set
as multiple error with
every other error type.
Er.
Nr
.
Comm.
Nr.
Type of Error
Switch Multi.
Error
Comment