Installation
15
Threading the fabric sack into the frame
First align the fabric sack so that both filling openings
point to the correct side of the installation room. Then
hook the fabric sack into the frame.
Install each of the threaded cross bars with 4 M8 x 45
screws and nuts hand-tight.
Fix the threaded pipe on the underside of the fabric
sack with the clamps. Tighten the M8 x 60 screws for
this.
Then tighten all screws.
Installing the filling nozzle
Hook the bracket into the frame and fix it with 4 M8 x
20 screws.
Summary of Contents for ETAbox Speed
Page 9: ...Installation room Sample 9 Required clearance for filling...
Page 26: ...www eta co at...
Page 27: ......
Page 28: ...www eta co at www eta co at downloads DOWNLOAD...