background image

 GVO  2315

SLOPING ROOF SHED

2280mm wide x 1530mm deep x 1980mm - 1830mm high

ASSEMBLY 

INSTRUCTIONS

YOU SHOULD HAVE TWO PACKAGES:

• 

1 cardboard package

• 

1 plastic wrapped package

TOOLS REQUIRED:

• 

Battery or electric drill

• 

3.3mm (1/8th inch) drill bit

• 

Screwdriver or riveter

• 

Tape measure

• 

Ladder

• 

Non-slip gloves, good 

  shoes and goggles

• 

A set of helping hands

CALL 0508 454 873

  

for an installer near you

Some parts have sharp edges and should  

be handled very carefully. We recommend  

the use of protective gloves and footwear  

when assembling. 
DO NOT attempt to erect this shed in windy 

weather. All dimensions are approximate.

PACKED BY:

Please quote this code for any 

correspondence back to the supplier

Summary of Contents for GVO 2315

Page 1: ...rewdriver or riveter Tape measure Ladder Non slip gloves good shoes and goggles A set of helping hands CALL 0508 454 873 for an installer near you Some parts have sharp edges and should be handled ver...

Page 2: ...of 2 x 793mm U channels door spacers 2 x Z Door braces BUILDING YOUR SHED The basic task is to join the sheets together to form your panels and fix channels to the top and bottom of these panels They...

Page 3: ...e U channels and fixing it to the sheet ribs and the side U channels Attach the hinges N approx 150mm from the top and bottom of the door through the U channels The fixings should be centred on the si...

Page 4: ...or ADDITIONAL INFORMATION Channels will come short of the ends of the sheeting by 10 15mm on all panels PADLOCK KEEPER ASSEMBLY KEEPER WASHER RIVET CHANNELS The higher side of the channel goes to the...

Page 5: ...ck Cap the sheeting with the 2255mm U channels F Fix the channels at every second rib but not the corners at this stage Place the short flange of the first L flashing K on top of the rib at one end Ma...

Page 6: ...at the top overlapping in the centre behind the padbolt If you have a locking T handle you will have to run the Z s the opposite way to the diagram Rivet the Z s at the ends and in the centre of the...

Page 7: ...l of the front and the back walls 10mm more than the overhang Fix beside every second rib You will not need to worry about these fixings leaking as any water seeping through these fixings will end up...

Page 8: ...nt or act of God including weather b The warranty shall cease and the Supplier shall thereafter in no circumstances be liable under the terms of the warranty if the workmanship is repaired altered or...

Reviews: