![eta ETAbox Speed Operating Instructions Manual Download Page 19](http://html1.mh-extra.com/html/eta/etabox-speed/etabox-speed_operating-instructions-manual_2430554019.webp)
Configuration
19
6
Configuration
Content of this configuration
Only the steps required for the configuration of this
product are described below. The configuration of the
complete heating system is described in the "Configu-
ration" manual supplied with the boiler.
Starting the configuration assistant
The process of starting the configuration assistant
differs depending on the installed software version.
Software version X.35.X and earlier
•
Increase the authorisation to [Service]. Then open
the [Toolbox] menu by pressing the
button and
the [Configure system] button.
Software version X.36.0 and later
•
In the system settings
, increase the authoriza-
tion to [Service] and open the system configuration
menu with the [Systems configuration] button.
Start the configuration assistant with the
[Starting the assistant] button.
Description for software version X.36.0 and later
The following description and screen shots represent
the software interface of version X.36.0 and later.
Adjusting function block [Store]
This function block has already been installed at
the factory and configured as pellet conveyor
[Standard screw]. Setting[ETAbox with conveyor
screw] must be selected for the ETAbox with discharge
screw.
Select the function block from the [Selected function
blocks] column.
Open the settings for the function block. Here, make
the following selections:
Press the [Accept] button to save.
Configure rest of heating environment
Configure the rest of the heating environment
(heating circuits, buffers, hot water tanks, etc.);
see the separate "Configuration" manual provided with
the boiler.
Establishing a [Pellets] connection
Establish a new connection by pressing the button
[New connection] and select the connection
type [Pellets] The producers and consumers must be
specified for these; see the following table.
Terminal assignment of the ETAbox
The terminal assignment for the ETAbox is shown in
function block of the pellet store. The ETAbox is
connected to the terminal [S29] of the [PE-C] circuit
board at the factory.
Further configuration and installation
Continue with configuration and installation of the
heating system as described in the "Configura-
tion" manual supplied with the boiler.
Selected function blocks
PE-C 0
Store
ETAbox with conveyor screw
Connections
Pellets
Producers
PE-C 0: Store: Pellets
Consumers
PE-C 0: Boiler: Fuel
Summary of Contents for ETAbox Speed
Page 9: ...Installation room Sample 9 Required clearance for filling...
Page 26: ...www eta co at...
Page 27: ......
Page 28: ...www eta co at www eta co at downloads DOWNLOAD...