14
www.eta.co.at
Exchanging a BE-P3
Installation
Connect the USB adapter cable (part of delivery
scope) to the control panel and the existing boiler USB
cable. If a network cable was previously connected,
also connect it to the control panel.
Fig. 3-30: USB adapter cable
Reattach the frame to the panels.
3.4
Exchanging a BE-P3
Replacing the "BE-P3" control panel
The "BE-P3" control panel is replaced by a new "BE-
P3" in the same way as described in the previous
chapters. However, only the control panel is
exchanged, the brackets and the USB lines are not
required.
After replacing, a software update to the latest version
3.XX.X is necessary. Download the latest version
3.XX.X (e.g.: 3.39.0) for this purpose. You can find
more info in chapter
.
Summary of Contents for BE-P3
Page 19: ......
Page 20: ...www eta co at www eta co at downloads DOWNLOAD...