8
www.eta.co.at
Exchange for PelletsUnit/ PelletsCompact
Installation
Mount new control panel
Place the new control panel in the new frame and
carefully install it with two screws. Note the correct
alignment of the control panel. The ETA logo must be
on top.
Fig. 3-5: Attachment
Plug the supplied USB cable (angled plug and socket)
to the side of the control panel and attach the socket to
the frame.
Fig. 3-6: USB cable
Connect the USB adapter cable (part of delivery
scope) to the control panel and the existing boiler USB
cable. If a network cable was previously connected,
also connect it to the control panel.
Fig. 3-7: USB adapter cable
Reattach the frame to the panels.
Reattach the boiler's cover panels.
Summary of Contents for BE-P3
Page 19: ......
Page 20: ...www eta co at www eta co at downloads DOWNLOAD...