CU-DIN R 4-CH 16 A KNX
CU-DIN R 8-CH 16 A KNX
15 / 54
CU-DIN R 12-CH 16 A KNX
USER MANUAL
5.3 Function parameter “General”
Fig 1: “General” parameters window
In the General parameters window, two parameters can be set:“Switching delay
after recovery ” and “Cycle send general telegram”.
Operation delay after recovery (2–200 s)
Can be used for a delay time of 2–200 s after the power is available again. The
default value is 2 seconds. The min. value is 2 seconds and the max. value is
200 seconds.
Options:
2-200 s
After voltage recovery and the adjusted delay-time (2–200 s) is counted down
the switch is ready for use. This function is selected by the user.
Sending cycle of object “In operation”(1–65,535 s, 0 - invalid)
The range of the parameter is 0 to 65,535 s. A zero parameter disables the
function, other parameters enable this function
Options:
1–65,535 s