background image

12    

14. Set dip switches into the correct position for your gate opener:

DP 1 

ON: 

Auto-Close on (the gate will re-

close from the open position after a time 
set in the programming section) 

OFF: 

Auto-Close off 

DP 2 

ON: 

Dual gate opener  (2 motor s) 

OFF: 

Single gate opener  (1 motor ) 

DP 3 

ON: 

Gate lock terminals active 

OFF: 

Gate lock terminals inactive 

Power Connection 

15. Crimp the battery connectors (not included) to the battery wire. The only power connected to the Estate Swing E-S Allegiant control
board will be the battery* (not included). 

Important: 

Please respect polarity when attaching the battery terminals. Do not cross wires.

Connect the factory installed spade connectors to the control board as seen in diagram below.

*A Group Size 24 Deep Cycle Marine battery is required for this system. The battery size may be increased for power storage. 

Note:

Deep cycle marine batteries are available at auto part stores, home stores, and battery stores. 

If the battery sitting in the bottom of the

control box no longer leaves room for wires to be fed into the box, set the battery atop the battery lifts.

16. Connect the charging controls to the battery. See below for connection details

Transformer / Charge board: 

Transformer can be located up to 200 feet from the battery using 16 gauge 2 conductor wire. 
Connect positive and negative of transformer to positive and negative of solar terminals of charge board. 
Connect positive and negative of battery to positive and negative battery terminals of charge board. 
Respect polarity. Out terminals are not used. Charge board can be placed on top of battery. Transformer 
must be in an indoor location or under a plug cover. 

20 Watt or Higher / Charge board: 

Connect positive and negative of solar panel to positive and negative of solar terminals of charge board. 
Connect positive and negative of battery to positive and negative  battery terminals of charge board. 
Respect polarity. Out terminals are not used. Charge board can be placed on top of battery. 

5 and 10 Watt solar panel 

Connect the positive and negative of the solar panel 
directly to the battery respecting polarity.  

Solar panels can be placed up to 200 feet away using 16 gauge 2 conductor wire. 
Solar panels must be in full sun and directed south. 

20 Watt 

or 

Charge 

Board 

Control 

Board 

5 Watt 

10 Watt 

or 

Control 

Board 

Summary of Contents for E-S Allegiant Series

Page 1: ...f Installation and Operation Manual Estate Swing brand gate openers are a Sequoia Brands Inc product Please visit www estateswing com for manual updates and other product information This gate opener...

Page 2: ...arging Control 16 16 16 650lbs 650lbs 650lbs Notes 1 When laying electrical cables use appropriate rigid and or flexible tube 2 Do not run any wires in the same conduit as110 AC power that may be in t...

Page 3: ...ock Washer Washer Nut Control box with control board Battery Harness wire with two loose ends for you to attach to battery connectors not included Charge controller Transformer with spade connectors f...

Page 4: ...direct burial low voltage wire Needed for wired accessories the transformer to the control box the solar panel to the control box 4 3 8 Carriage Bolts Lock Washers and Nuts This is for attaching your...

Page 5: ...your gate in towards the property The majority of installations are pull to open PUSH TO OPEN This operation is commonly used if your driveway slopes up after the gate preventing it from swinging in T...

Page 6: ...e on the post or column The only location of importance is the boomerang bracket that the gate opener attaches to matches the setback on this page 5 Use the setback for the degree you are trying to op...

Page 7: ...ang bracket template for trimming Trim the boomerang bracket to match the template 2 Place the boomerang template on the other corner of the setback template Pivot the boomerang bracket template to th...

Page 8: ...ang bracket through hole of the L shape using a 3 8 drill bit 6 Insert the 3 8 bolt and secure the boom erang in place after checking once again it is positioned to match the setback using a lock wash...

Page 9: ...k washers washers and nuts Recheck the open position at this point it is adjusta ble by the length of the oblong holes After the location is confirmed drill a 1 4 hole through the center hole of the g...

Page 10: ...a high moisture area apply petroleum jelly on to the terminal block to protect from moisture Running wire under the driveway Needed Narrow shovel water pipe no more that 5 in length you would need a t...

Page 11: ...ave the factory installed jumper between the terminals PHOTO and GND installed If using a photo eye it is best to leave the jumper installed until after programming is finished and accessories are bei...

Page 12: ...the battery atop the battery lifts 16 Connect the charging controls to the battery See below for connection details Transformer Charge board Transformer can be located up to 200 feet from the battery...

Page 13: ...ly close at full speed Once closed the programming is complete For SINGLE GATE Push to Open 17 Remove sticker on end of the arm Press release the SET button P1 will show on the display Press release D...

Page 14: ...automatically close at full speed Once closed the For DUAL GATE Push to Open 17 Remove sticker on end of the arm Press release the SET button P1 will show on the display Press Add to select PC for pu...

Page 15: ...t if there is a delay and closes second It is recommended to have a delay of 3 seconds to avoid any jamming issues between leafs P5 is release time for the gate lock Note this parameter will only disp...

Reviews: