background image

8     

 

4. Place one of the L shape brackets with 
the top lined up with the line drawn on the 
post in step 3. The side of post the bracket 
will be on was determined in step 2 when 
lining up the boomerang bracket. Drill two 
holes using a 3/8” drill bit and attach with 
the appropriate 3/8 bolt, washer, lock 
washer and nut. 

4. Place one of the L shape brackets with 
the top lined up with the line drawn on the 
post in step 3. The side of post the bracket 
will be on was determined in step 2 when 
lining up the boomerang bracket. Drill two 
holes using a 3/8” drill bit and attach with 
the appropriate 3/8 bolt, washer, lock 
washer and nut. 

5. Place the trimmed boomerang bracket on 
top of the L shape bracket mounted in step 
4. Then place firmly atop the boomerang 
bracket the second L shape bracket. Mount 
the second L shape bracket using 3/8” 
holes and hardware. After mounting of the 
second L shape, pivot the sandwiched 
boomerang bracket to match the setback 
and drill the boomerang bracket through 
hole of the L shape using a 3/8” drill bit. 

6. Insert the 3/8” bolt and secure the boom-
erang in place after checking once again it 
is positioned to match the setback using a 
lock washer, washer, and nut. Locate a part 
of the L shape  brackets that when drilled 
through will also pass through the boomer-
ang bracket. Drill using a 5/16” bit and 
secure using the 5/16” bolt, lock washer, 
washer and nut.  

6. Insert the 3/8” bolt and secure the 
boomerang in place after checking once 
again it is positioned to match the  
setback using a lock washer, washer, and 
nut. Locate a part of the L shape   
brackets that when drilled through will 
also pass through the boomerang brack-
et. Drill using a 5/16” bit and  
secure using the 5/16” bolt, lock washer, 
washer and nut.  

5. Place the trimmed boomerang bracket 
on top of the L shape bracket mounted in 
step 4. Then place firmly atop the boomer-
ang bracket the second L shape bracket. 
Mount the second L shape bracket using 
3/8” holes and hardware. After mounting 
of the  
second L shape, pivot the sandwiched 
boomerang bracket to match the setback 
and drill the boomerang bracket through 
hole of the L shape using a 3/8” drill bit. 

Summary of Contents for E-S Allegiant Series

Page 1: ...f Installation and Operation Manual Estate Swing brand gate openers are a Sequoia Brands Inc product Please visit www estateswing com for manual updates and other product information This gate opener...

Page 2: ...arging Control 16 16 16 650lbs 650lbs 650lbs Notes 1 When laying electrical cables use appropriate rigid and or flexible tube 2 Do not run any wires in the same conduit as110 AC power that may be in t...

Page 3: ...ock Washer Washer Nut Control box with control board Battery Harness wire with two loose ends for you to attach to battery connectors not included Charge controller Transformer with spade connectors f...

Page 4: ...direct burial low voltage wire Needed for wired accessories the transformer to the control box the solar panel to the control box 4 3 8 Carriage Bolts Lock Washers and Nuts This is for attaching your...

Page 5: ...your gate in towards the property The majority of installations are pull to open PUSH TO OPEN This operation is commonly used if your driveway slopes up after the gate preventing it from swinging in T...

Page 6: ...e on the post or column The only location of importance is the boomerang bracket that the gate opener attaches to matches the setback on this page 5 Use the setback for the degree you are trying to op...

Page 7: ...ang bracket template for trimming Trim the boomerang bracket to match the template 2 Place the boomerang template on the other corner of the setback template Pivot the boomerang bracket template to th...

Page 8: ...ang bracket through hole of the L shape using a 3 8 drill bit 6 Insert the 3 8 bolt and secure the boom erang in place after checking once again it is positioned to match the setback using a lock wash...

Page 9: ...k washers washers and nuts Recheck the open position at this point it is adjusta ble by the length of the oblong holes After the location is confirmed drill a 1 4 hole through the center hole of the g...

Page 10: ...a high moisture area apply petroleum jelly on to the terminal block to protect from moisture Running wire under the driveway Needed Narrow shovel water pipe no more that 5 in length you would need a t...

Page 11: ...ave the factory installed jumper between the terminals PHOTO and GND installed If using a photo eye it is best to leave the jumper installed until after programming is finished and accessories are bei...

Page 12: ...the battery atop the battery lifts 16 Connect the charging controls to the battery See below for connection details Transformer Charge board Transformer can be located up to 200 feet from the battery...

Page 13: ...ly close at full speed Once closed the programming is complete For SINGLE GATE Push to Open 17 Remove sticker on end of the arm Press release the SET button P1 will show on the display Press release D...

Page 14: ...automatically close at full speed Once closed the For DUAL GATE Push to Open 17 Remove sticker on end of the arm Press release the SET button P1 will show on the display Press Add to select PC for pu...

Page 15: ...t if there is a delay and closes second It is recommended to have a delay of 3 seconds to avoid any jamming issues between leafs P5 is release time for the gate lock Note this parameter will only disp...

Reviews: