background image

13    

Programming Piston Extended Position 

For SINGLE GATE Pull to Open: 

17. Remove sticker on end of the arm.
Press/release the SET button. P1 will show
on the display. Press/release DEC button
until 01 is on the display.

18. Press/release the SET button repeatedly
until display returns to dots.

19. Press/hold the SET button until U1 is
on the display.

20. The gate opener is in programming
mode. Press/hold DEC button. The piston
will slowly extend as you hold DEC
button.
Release the DEC button when the gate
reaches the closed position.

If DEC button is released it can be
pressed again to close further. If gate is
over closed press/hold ADD button to re-
tract piston.

21. When closed position is correct press/
release the set button. Then press/release
ADD button.

The gate will slowly open to the full open 
position. Once open it will automatically 
close at full speed. Once closed, the  
programming is complete.

 

For SINGLE GATE Push to Open: 

17. Remove sticker on end of the arm.
Press/release the SET button. P1 will show
on the display. Press/release DEC button
until 00 is on the display.

18. Press/release the SET button repeatedly
until display returns to dots.

19. Press/hold the SET button until U1 is
on the display.

20. The gate opener is in programming
mode. Press/hold DEC button. The piston
will slowly extend as you hold DEC
button.
Release the DEC button when the gate
reaches the open position.

If DEC button is released it can be
pressed again to open further. If gate is
past open press/hold ADD button to retract
piston.

21. When open position is correct press/
release the set button. Then press/release
ADD button.

The gate will slowly open to the full closed 
position. Once closed it will automatically 
open at full speed. Once open, the  
programming is complete.

 

*Note: If reprogramming rather than programming for the first time read programming note in trouble shooting section first.

Summary of Contents for E-S Allegiant Series

Page 1: ...f Installation and Operation Manual Estate Swing brand gate openers are a Sequoia Brands Inc product Please visit www estateswing com for manual updates and other product information This gate opener...

Page 2: ...arging Control 16 16 16 650lbs 650lbs 650lbs Notes 1 When laying electrical cables use appropriate rigid and or flexible tube 2 Do not run any wires in the same conduit as110 AC power that may be in t...

Page 3: ...ock Washer Washer Nut Control box with control board Battery Harness wire with two loose ends for you to attach to battery connectors not included Charge controller Transformer with spade connectors f...

Page 4: ...direct burial low voltage wire Needed for wired accessories the transformer to the control box the solar panel to the control box 4 3 8 Carriage Bolts Lock Washers and Nuts This is for attaching your...

Page 5: ...your gate in towards the property The majority of installations are pull to open PUSH TO OPEN This operation is commonly used if your driveway slopes up after the gate preventing it from swinging in T...

Page 6: ...e on the post or column The only location of importance is the boomerang bracket that the gate opener attaches to matches the setback on this page 5 Use the setback for the degree you are trying to op...

Page 7: ...ang bracket template for trimming Trim the boomerang bracket to match the template 2 Place the boomerang template on the other corner of the setback template Pivot the boomerang bracket template to th...

Page 8: ...ang bracket through hole of the L shape using a 3 8 drill bit 6 Insert the 3 8 bolt and secure the boom erang in place after checking once again it is positioned to match the setback using a lock wash...

Page 9: ...k washers washers and nuts Recheck the open position at this point it is adjusta ble by the length of the oblong holes After the location is confirmed drill a 1 4 hole through the center hole of the g...

Page 10: ...a high moisture area apply petroleum jelly on to the terminal block to protect from moisture Running wire under the driveway Needed Narrow shovel water pipe no more that 5 in length you would need a t...

Page 11: ...ave the factory installed jumper between the terminals PHOTO and GND installed If using a photo eye it is best to leave the jumper installed until after programming is finished and accessories are bei...

Page 12: ...the battery atop the battery lifts 16 Connect the charging controls to the battery See below for connection details Transformer Charge board Transformer can be located up to 200 feet from the battery...

Page 13: ...ly close at full speed Once closed the programming is complete For SINGLE GATE Push to Open 17 Remove sticker on end of the arm Press release the SET button P1 will show on the display Press release D...

Page 14: ...automatically close at full speed Once closed the For DUAL GATE Push to Open 17 Remove sticker on end of the arm Press release the SET button P1 will show on the display Press Add to select PC for pu...

Page 15: ...t if there is a delay and closes second It is recommended to have a delay of 3 seconds to avoid any jamming issues between leafs P5 is release time for the gate lock Note this parameter will only disp...

Reviews: