10
Kongsberg XN / iPC 2.0
55
Machine
Zone Configuration
Vacuum Configuration
XN46
#5
XN48
#13
10.12.2 Using two vacuum pumps
Machine Connection
->
Machine Configuration
->
HW Configuration
->
2 Vacuum
Pumps
Enable this parameter if your machine is equipped with
two vacuum pumps
(option).
Note: When running
two vacuum pumps
, the start of the second pump is slightly delayed.
10.13 Router Setup
Machine Connection
->
Machine Configuration
->
HW Configuration
->
Router Setup
From the
Router Setup
dialog, maintain the following parameters:
Specify Router
If a
Router
is mounded, spedify
Router Type
.
If no
Router
is mounted, select
None
COM-port
The physical COM-port used for communication with the
Router Control Unit
is specified.
Note:
The
Router Control Unit
needs to be connected to a genuine COM port. If connected
to a USB-to-COM adapter, the communication will fail.
These functions are used only after a hardware modification.
10.14 Conveyor Belt Control
Machine Connection
->
Machine Configuration
->
HW Configuration
->
Conveyor