Recommended Installation Process:
The following diagram illustrates the steps required to install your gas fire, and the trades
required at each stage.
The sequence in which you choose to do these tasks will vary depending on your individual
scenario. Please read these instructions fully before proceeding with the installation. Leave the
installation of the fascia panels until the very end of the installation and
commissioning to avoid damage to the fascia panels.
Builder
1.
Construct Frame (Section 1.0 to 6.0)
Gasfitter
5.
Install Flue + Flue Restrictor if required (Section 13.0)
6.
Test fire and verify flame pattern is acceptable
7.
Cover-up fire using packaging (Section 16.0)
Electrician
2.
Install Electrical connection (Section 15.0)
Gasfitter
3.
Install Gas Pipe (Section 7.0 to 8.0)
4.
Install Fire (Section 9.0 to 12.0)
Ensure that you leave a gap between the studwork and fire
chassis to accept the wall lining
if applicable.
Builder
8.
Gib / line chimney breast
Gasfitter
9.
Commission the Gas Fire (Section 17.0)