17.0
Covering up the fire:
Before the wall surrounding the ST900 is lined, the fire must be covered up and sealed to
prevent Gib dust from getting into the fire. It is recommended that the packaging supplied
with the fire is used to achieve this.
18.0
Commissioning the Fire:
After the cladding and finishing processes are completed, the gasfitter must return to the
site to run the fire for a minimum of 20 minutes and finally assemble and fit the fascia and
associated accessories.
18.1
Assembling the Ferro fascia:
1.
The ST900 Ferro fascia has two brackets supplied in the fascia box which have not been
fully assembled. To assemble them use the 4x screws supplied to fasten the brackets to the
fascia as shown below. Position the brackets with the flange facing outwards, and the
hooks facing the bottom of the fascia [Identify the bottom of the fascia by the large cut-out
shown
below].
→ If you are installing a
FERRO
fascia:
SEE SECTION 18.1
→ If you are installing a
VELO
fascia: (Available in NZ only)
SEE SECTION 18.2