background image

BURY LINE

Figure 5

4.

Mix concrete per the instructions on concrete bag.  Pour into the hole 

and stop about 16” from Playing Surface or until you can still see the top 

of the Masonry block you placed earlier. See 

Figure 5 

and

 Detail 1

.

5.

Set the bottom of the pole on the masonry block in the hole.  Make 

sure the Pole stays on the block as shown in 

Figure 5

. The Bury line 

should be level with the playing surface see 

Detail 1

.

While one person holds the pole in place have two other people finish 

pouring concrete up to court level. Use a level to make sure Pole is vertical.

6.

Detail 1

PL

AY

IN

G S

UR

FA

CE

IMPORTANT

BE SURE THAT THE HOLES ARE TOWARD THE 
BACK OF THE POLE AND “BACK SIDE” 
STICKERS ARE AT THE BACK OF THE POLES/ 
OPPOSITE THE PLAYING SURFACE BEFORE 
POURING CONCRETE ON STEPS 4-6.

7

(Court Level)

THE  FOLLOWING  STEPS  WILL  REQUIRE

AT LEAST THREE CAPABLE ADULTS.

IMPORTANT

16"

PLAYING SURFACE

DO NOT DUNK ON THIS UNIT . 

DO NOT HANG FROM ANY PART OF THIS 
UNIT , INCLUDING THE BACKBOARD, RIM, 

SUPPORT BRACES OR NET

4L-8152-00 

W

AR

NI

NG

 

!

Summary of Contents for GOALIATH B2253

Page 1: ...tighten them O W N E R S M A N U A L B2253 Please Do Not Return This Product T o The Store Contact Escalade Sports customer service department at Phone 1 888 USA GOAL Toll Free Fax 1 866 873 3536 Tol...

Page 2: ...rom any part of the unit including the backboard rim support braces or net Do not slide climb or play on pole Keep organic material away from pole base Grass litter etc could cause corrosion and or de...

Page 3: ...MAY RESULT IN SERIOUS INJURY OR PROPERTY DAMAGE BACKSIDE Bottom of upper pole must cover the above orange portion of this sticker 6 mark WARNING 4L 8151 00 Affixed to Bottom Post 3 Affixed to Top Post...

Page 4: ...4 3 8 16 X 1 3 4 4 Pieces Hex Bolt 2 Pieces 10 X 1 10 Pieces 3 8 16 Lock Nut 14 pieces 1 2 13 Lock Nut 1 piece...

Page 5: ...eter Court Hole Court Level 20 Diameter Court Top View Hole must be close to the Court without making contact Dig a round hole 32 deep and 16 in diameter at the top and 20 in diameter at the bottom of...

Page 6: ...lips head NOTE Screws 42 used in step 3 are Self Drilling screws and can be installed without drilling pilot holes However it will be easier to install screws if you drill 9 64 pilot holes in bottom p...

Page 7: ...ne person holds the pole in place have two other people finish pouring concrete up to court level Use a level to make sure Pole is vertical 6 Detail 1 P L A Y I N G S U R F A C E IMPORTANT BE SURE THA...

Page 8: ...k pole with level to ensure that pole is vertical Figure 6 IMPORTANT Let concrete stand for a MINIMUM of 48 hours 2 days before proceeding to the next step In humid climates or wet weather allow addit...

Page 9: ...3 Plastic Actuator Sleeve 15 and Steel Actuator 16 until equal amounts stick out through both sides of actuator See Figure 8 7 1 10 4 14 15 16 19 20 21 13 FAIL URE TO FUL LY ENG AGE THE BOT TOM OF THE...

Page 10: ...bolt 22 two flat washers 18 two plastic washers 5 and one lock nut 4 See Figure 10 and Detail 3 Tighten both bolts 22 snug but do not over tighten Board Arms must pivot freely FA ILU RE TO FU LL Y EN...

Page 11: ...of the backboard lower the backboard by turning the Actuator Crank until the lower arm makes contact with Stop Spacer 10 Figure 12 6 7 18 8 18 4 9 3 16 Stop Spacer 10 35 34 11 Figure 11 using a bolt...

Page 12: ...ot point Snug is tight enough 22 Attach Upper Board Arms to upper mounting tubes on backboard using two bolts 24 two plastic washers 5 four washers 18 and two lock nuts 4 See Figure 13 NOTE Do NOT ove...

Page 13: ...Note Tighten screws tight but do not over tighten Figure 14 Note Cordless drill recommended for screw installation Do not over tighten screws causing screws to strip Note To install screws it will be...

Page 14: ...ce height decal on backside of steel actuator and line up the 16 10 ft mark on the tape with the 10 ft mark on the height decal Decal should fit correctly onto the backside of the steel actuator If no...

Page 15: ...not cover the Warning Label on the front of the pole with the Pole Pad should cover Post Screws but remain below Warning Label on front of the Pole See Figure 18 Make sure to repostion Pole Pad if Sl...

Page 16: ...the part of the purchaser and Escalade Sports neither assumes nor authorizes any other person to assume for it any other liability in connection with the goods sold This warranty shall not apply in an...

Page 17: ...7540 01 This Manual 1 3M 6899 00 48 Board Pad Right 1 3M 6900 00 48 Board Pad Left 1 3M 6901 02 3F 6010 00 Net 1 3 8 16 x 1 3 4 Carriage Bolt 4 Not Used 1B 7039 00 Self Tapping Screw 10 x 1 10 B2253...

Page 18: ...2 18 5 4 22 4 10 7 10 4 24 18 18 18 26 4 Pre Installed 42 40 27 32 33 42 17 39 2L 7540 01 18 34 30 Pre Installed DO NO T DU NK ON TH IS UN IT DO NO T HA NG FR OM AN Y PA RT OF TH IS UN IT INC LU DIN...

Reviews: