background image

Tools

 

Required:

 

Flathead

 

screwdriver,

 

Phillips

 

screwdriver,

 

pliers,

 

wire

 

cutters,

 

wire

 

strippers,

 

electrical

 

tape,

 

safety

 

glasses.

Light

 

Source:

 

(2) A19

 

Medium

 

Base

 

Bulbs

 

60W

 

Maximum, Alternate

 

Bulbs

 

(2)13W

 

CFL Maximum.

Estimated

 

Assembly

 

Time:

 

20-30

 

minutes

Preparation:

 

Identify

 

and

 

inspect

 

all

 

parts

 

before

 

beginning

 

installation.

 

Check

 

package

 

content

 

list

 

and

 

diagrams

 

below

 

to

 

be

 

sure

 

all

 

parts

 

are

present.

 

If

 

any

 

parts

 

are

 

missing

 

or

 

damaged,

 

do

 

not

 

attempt

 

to

 

assemble,

 

install,

 

or

 

operate

 

the

 

fixture.

 

Contact

 

customer

 

service

 

for

 

replacement

parts.

1of2

Package Contents

B

Crossbar
x 1

Lock Washer
x 1

Hex Nut
x 1

Nipple
x 1

A

F

Fixture Body
x 1

Warnings and Cautions

Turn off electricity at circuit breaker or main fuse box before installation. Consult a licensed electrician if in doubt.

These instructions are provided for your safety. It is very important you read them completely before installing the fixture. We strongly
recommend that a licensed, professional electrician perform the installation.

Disconnect fixture from power source before replacing bulbs. Make sure bulbs are given sufficient time to cool before removal. Do not subject
glass parts to any shock while in operation or shattering may result.

C

D

Knob
x 1

E

G

Glass Panel
x 1

STEP 1

Remove Cage

-

A. Remove Cage from the

Ceiling Canopy by unlocking
Lock Balls.

Ceiling
Canopy

Lock Ball

Cage

Figure 1

STEP 2

Install Crossbar

-

A.

A)

Attach the Crossbar (

to the Outlet Box with the head of the Green

Ground Screw facing you. Secure it with Outlet Box Screws (not
included)

Tighten until snug

.

.

Figure 2

Outlet Box

Outlet Box Screw
(not included)

Green Ground

Screw

A

Figure 2

A

B

C

D

E

STEP 3

Install Nipple and Ceiling

Canopy

-

*

Pliers is required for this step.

A. Thread Hex Nut (C) to the middle of

the Nipple (D). Place Lock Washer (B)
over the Nipple (D) and then thread
the Nipple (D) into the Crossbar (A)
until the Nipple (D) is about 0.375”
above the Crossbar (A).
C. Place the Ceiling Canopy over the
Nipple (D) against the ceiling to

Ceiling
Canopy

(Step 3 Continued)

determine the correct position of the Nipple (D). Thread the Knob
(E) onto the Nipple (D). Adjust the Nipple (D) to allow the Ceiling
Canopy to rest against the ceiling when held in place by the Knob
(E).

D. Remove the Knob (E) and the Ceiling Canopy. Tighten the Hex Nut

(C) against the Crossbar (A) to secure in place.

E. Refer to Step 4 for wire connections.
F. Place the Ceiling Canopy back over the Nipple (D) and secure with

the Knob (E). Hand tighten until snug.

STEP 4 - Wire Connections

A. Use standard wire connectors (not included) to make all wire

connections. (Connectors are not included with fixture.) Twist
connectors until wires are tightly joined together. Wrap each
connection with approved electrical tape and carefully stuff all the
connected wires into the Outlet Box.

White wire

from supply

White wire
from fixture

Black wire from
supply (or Red)

Black wire
from fixture

Ground wire

from supply

Ground wire
from fixture

Figure 4

STEP 5 - Install Bulbs and Cage

A. Place the Glass Panel (G) into the bottom of the Cage (G) properly.
B. This fixture uses standard bulbs with standard screw bases.

Maximum 60 watts.

C. Attach the Cage over the Bolts on the bottom of the Ceiling Canopy

Insert bulb and screw snugly into place.

Socket

Figure 5

Bolt

G

Cage

Lock
Ball

Ceiling
Canopy

and secure with Lock
Balls. Hand tighten until
snug.

Your fixture is now
assembled and ready to
use. Enjoy!

Installation Instructions:

 

UQL

124

9

www.urbanambiance.com

Reviews: