43
seCtIon 4
operatIon
4.4.2.3 aluminum
Current
50-65A
50-65A
100A
150A
150A
200A
200A
200A
Plasma Gas
N
2
AIR
AIR
AIR
H-35
N
2
AIR
H-35
Shield Gas
N
2
AIR
AIR
AIR
N
2
AIR
AIR
N
2
D
ro
ss
An
gl
e
Su
rf
ace
D
ro
ss
An
gl
e
Su
rf
ace
D
ro
ss
An
gl
e
Su
rf
ace
D
ro
ss
An
gl
e
Su
rf
ace
D
ro
ss
An
gl
e
Su
rf
ace
D
ro
ss
An
gl
e
Su
rf
ace
D
ro
ss
An
gl
e
Su
rf
ace
D
ro
ss
An
gl
e
Su
rf
ace
1,6mm
(1/16 in.)
E 1 G
E 2 F
3,2mm
(1/8 in.)
E 1 G
E 2 F
6,4mm
(1/4 in.)
E 1 G
E 2 F
E 1 G
E 2 G
E 2 E
G 4 G
E 3 G
9,6mm
(3/8 in.)
E 1 G
E 1 G
E 2 E
G 3 G
E 2 G
12,7mm
(1/2 in.)
E 3 G
E 1 G
E 2 E
G 3 F
E 1 G
19,1mm
(3/4 in.)
G 3 P
G 1 F
E 3 E
G 2 F
G 1 F
25,4mm
(1 in.)
G 1 F
E 1 E
G 1 P
G 1 F
Summary of Contents for ESP-200
Page 1: ...ESP 200 Plasmarc Cutting System Instruction Manual F15 462 C 02 2008 ...
Page 12: ...12 section 2 description ...
Page 31: ...31 section 3 installation Plumbing box fully connected including setup pendant ...
Page 32: ...32 CE 1 2 3 4 5 6 7 9 10 11 12 13 16 19 20 21 22 15 17 18 14 section 3 installation 8 ...
Page 84: ...84 section 7 replacement parts 1 2 3 4 5 6 7 8 9 10 11 12 13 7 6 Right Inside View ...
Page 88: ...88 section 7 replacement parts 6 1 4 5 6 R ef R ef 2 3 7 8 Back and Top Inside View ...
Page 92: ...92 section 7 replacement parts 1 2 3 4 5 6 7 8 7 10 Remote Setup Pendant P N 37145 ...
Page 100: ...100 notes ...