15
3.1 general
Proper installation is important for satisfactory and trouble-free operation of the ESP-101 cutting package. It is
suggested that each step in this section be studied carefully and followed closely.
3.2 Equipment required
A source of clean, dry, oil-free air that supplies 500 cfh (236 l/m) at 90 psig (6.2 bars) is required for the cutting
operation. The air supply should not exceed 150 psig (10.3 bars) (the maximum inlet pressure rating of the air
filter-regulator supplied with the package).
3.3 Placement and location
After selecting an installation site, place the ESP-101 in the desired location. The unit may be lifted by either an
overhead crane or forklift truck. If using forklift truck, be sure that the lift forks are long enough to extend com-
pletely under the base. If using straps, use two separate straps as shown in the illustration.
Adequate ventilation is necessary to provide proper cooling of the ESP-101. The amount of
dirt, dust, and excessive heat to which the equipment is exposed, should be minimized. There
should be at least one foot of clearance between the ESP-101 power source and wall or any
other obstruction to allow freedom of air movement through the power source.
3.4 Inspection
1. Remove the shipping container and all packing material and inspect for evidence of
concealed damage which may not have been apparent upon receipt of the ESP-101.
Notify the carrier of any defects or damage at once.
2. Check container for any loose parts prior to disposing of shipping materials.
3. Check air louvers and any other openings to ensure that any obstruction is removed.
SECTIoN 3
INSTallaTIoN
CauTIoN
Position the ESP-101 at least 10 feet (3 meters) from the cutting area.
Sparks and hot slag from the cutting operation can damage the unit.
INSTallINg or PlaCINg aNY TYPE of fIlTErINg DEVICE WIll rE-
STrICT ThE VoluME of INTaKE aIr, ThErEBY SuBJECTINg ThE PoW-
Er SourCE INTErNal CoMPoNENTS To oVErhEaTINg. ThE War-
raNTY IS VoID If aNY TYPE of fIlTEr DEVICE IS uSED.
WarNINg
-- 7 --
ba34d1ea
5.1
Lifting instructions
With power source
With trolley and power source With trolley2 and power source
5.2
Placing
Position the welding power source such that its cooling air inlets and outlets are not
obstructed.
GB
Summary of Contents for ESP-101
Page 4: ...4 table of contents...
Page 8: ...8 TABLE OF CONTENTS...
Page 38: ...38 section 4 operation...
Page 42: ...42 TABLE DES MATI RES...
Page 72: ...72 section 4 exploitation...
Page 76: ...76 NDICE...
Page 106: ...106 SECCI N 4 FUNCIONAMIENTO...
Page 110: ...110 NDICE...
Page 140: ...140 Se o 4 opera o...
Page 144: ...144 INDICE...
Page 174: ...174 sezione 4 funzionamento...
Page 178: ...178 INHALTSVERZEICHNIS...
Page 208: ...208 ABSCHNITT 4 Betrieb...
Page 209: ...ESP 101 0558007871 ESP 101 PxxJ943xxx 0558004880 ESP 101 460 V 0558005215 ESP 101 380 400V CE...
Page 210: ...210 52 529...
Page 212: ...212...
Page 213: ...213 1 1 0 ESAB 1 2 3 4 5 IP 12 mm 60 IP23S 15 15...
Page 214: ...214 1...
Page 215: ...215 2 2 1 ESP 101 PT 37 ESP 101 PT 37 1 1 4 32 mm ESP 101 2 2 ESP 101 ESABPT 37PLASMARC...
Page 224: ...224 3 3 4 3 5 2 Slo Blo 2 Amp 600 V 90 150 psi 6 2 10 3 bar...
Page 229: ...229 3 1 ESP 101 2 3 4 5 6 3 9 PT 37...
Page 231: ...231 3 A ESP 101 1 2 3 8...
Page 232: ...232 B RJB 1 2 RJB 3 1...
Page 233: ...233 3 ESP 101 PT 37 2 RJB 3 PT 37 RJB 4 ESP 101 3 9...
Page 234: ...234 3 ESP 101 ESP 101 PT 37 1 ESP 101 2 3 4 5...
Page 239: ...239 4 4 1 4 6 4 mm A B A B 4 4 4 5 4...
Page 240: ...240 5 volt 4 5 5 volt 4 6 4...
Page 241: ...241 4 6 ESP 101 ESAB A 1 2 3 4 5 6 B 1 2 3 1 2 3 4 5 1 2 3 4 5 1 2 1 2 3 1 2 3 H 1 2 3 4 4...
Page 242: ...242 4...
Page 246: ...246 OBSAH...
Page 276: ...276 odd l 4 provoz...
Page 290: ......