
Maintenance 10. Ball Screw Spline Unit
202
G10 / G20 Rev.20
(6) Set the Z belt around the Z1 pulley and Z2 pulley
so that the gear grooves of the belt are fit into those
of the pulleys completely.
Z belt
Z2 pulley
Z1 pulley
(7) Loosely secure the spline plate to Arm #2.
After moving the shaft up and down several times,
secure the spline plate to Arm #2.
3-M5
×
15
Spline plate
(8) Mount the brake to the Joint #4 intermediate pulley
unit.
When mounting the brake, be sure to keep the wave
washer from being stuck.
4-M4
×
12
Brake
Wave washer
Bearing
(9) Secure the brake hub with the two set screws.
2-M3
×
4
set screw
Brake hub
(10) Loosely secure the Joint #3 motor unit to Arm #2.
Loosely secure the Joint #3 motor unit to Arm #2
so that the motor unit can be moved by hand, and it
will not tilt when pulled. If the unit is secured too
loose or too tight, the belt will not have the proper
tension.
4-M4
×
15
+
Washer
Joint #3
motor unit
(11) Set the Joint #4 motor unit in Arm #2.
Place the Joint #4 motor unit in Arm #2 so that the
motor cable faces toward the left from the end of
the arm.
The screws are not secured in this step.
4-M4
×
15
+
Washer
Joint #4
motor unit
NOTE
Summary of Contents for G10 Series
Page 1: ...Rev 20 EM183R3619F SCARA ROBOT G10 G20 series MANIPULATOR MANUAL ...
Page 2: ...MANIPULATOR MANUAL G10 G20 series Rev 20 ...
Page 8: ...vi G10 G20 Rev 20 ...
Page 14: ......
Page 102: ...Setup Operation 5 Motion Range 90 G10 G20 Rev 20 ...
Page 104: ......