
Maintenance 9. Bellows
G10 / G20 Rev.20
191
9. Bellows
The bellows are provided in a unit of two pieces. The shape varies between the upper
and lower bellows.
A large amount of dust is emitted when replacing the bellows.
Take the Manipulator to an outer room such as the room in front of the clean room’s
entrance, or take the necessary countermeasures to prevent dust emission before removing
the bellows.
Name
Quantity
Note
Maintenance
parts
Bellows
150 mm
1
R13B030701
390 mm
R13B030703
Tools
Cross-point screwdriver
1
For clamp band removal
Bellows
Removal
(1) Remove the end effector.
(2) Remove the wires and tubes from the end effector.
(3) Turn ON the controller. Stop motor excitation. (MOTOR OFF)
(4) Loosen the two clamp bands on each bellows.
Bellows
Clamp band (small)
Clamp band (medium)
without rubber sheet
Clamp band (large)
Clamp band (small)
(5) Pull the bellows, rubber sheet, and clamp
bands out of the shaft.
(The rubber sheet is not used for the upper
bellows.)
NOTE
Summary of Contents for G10 Series
Page 1: ...Rev 20 EM183R3619F SCARA ROBOT G10 G20 series MANIPULATOR MANUAL ...
Page 2: ...MANIPULATOR MANUAL G10 G20 series Rev 20 ...
Page 8: ...vi G10 G20 Rev 20 ...
Page 14: ......
Page 102: ...Setup Operation 5 Motion Range 90 G10 G20 Rev 20 ...
Page 104: ......