All rights reserved. No part of this Manual may be reproduced or transmitted in any form or by any means, electronic or mechanical, including
photocopying, recording or by any information storage or retrieval system, without permission in writing from the publisher.
Doc #: EC501 / Rev. 1 / Effective Date: October 17, 2014
19
!
During placement always travel slowly until you become familiar and
comfortable with using Enviro™ Cover System (ECS).
During Deployment - It may become UNSAFE for placement on side slope
working face.
!
TRAVEL UP AND DOWN THE SLOPED WORKING FACE IN
FORWARD DIRECTION ONLY.
Operator should be aware of the ballast weight of the Enviro™ Cover
System attachment (Deployer). Operation of Model 800 must be in
accordance with the Morooka Track Carrier Operator Specifications /
Guidelines, see Manual.
!