All rights reserved. No part of this Manual may be reproduced or transmitted in any form or by any means, electronic or mechanical, including
photocopying, recording or by any information storage or retrieval system, without permission in writing from the publisher.
Doc #: EC501 / Rev. 1 / Effective Date: October 17, 2014
18
4)
Travel in a straight line for good film alignment. Avoid sudden or sharp changes in direction.
This will allow for good overlap by the following panels.
5)
For best results, deployment travel should be at a constant speed (always first gear,
approximately 1-2+ MPH depending on waste compaction and stability).
!
PRECAUTION WHEN TRAVELING
Failure to follow these general safety precautions may lead to a serious
accident
Check for Hydraulic Roll Arm clearance when traveling. The width of the
Deployer with the Hydraulic Roll Arms in the operating position is 21ft.
Avoid Obstacles
Avoid traveling close to obstacles such as earth embankment or protruding
waste as far as possible. Use the Hydraulic Roll Arm raise/lower function to
clear waste at the toes of the slope.
Keep Hydraulic Roll Arms in the Raised position and use only in deployment
Locking Hydraulic Roll Arms Lever
Lock the hydraulic roll arms control lever as follows:
1.
Release hydraulic roll arms control level- 1 and set it to the HOLD position
2.
Push lock lever- 2 to inside. This will lock the hydraulic roll arm control
lever- 1
3.
To release the lock from the hydraulic control lever, pull lock lever- 2 to
the outside. This will release the lock from hydraulic control lever- 1.