EOS Zeus S / EOS Zeus SL - Installation and Operating Instructions
EN-39
Commissioning
3
Lay the stones one by one on the stone grate to create a small pile. En-
sure there is enough space between them.
Do not place the stones on the decoration ring. The air must flow
freely.
5.2
Starting the heater
A slight odour may be produced the first time the cabin is heated because
the heater is being heated for the first time. The odour ceases upon contin-
ued operation of the heater.
Switching the system on
1
Switch the sauna control unit on.
The heater is switched on via the control unit.
2
Use the control unit to select a suitable program.
5.3
Commissioning by remote control
If you switch on the heater using the remote control, ensure that no
objects are placed on the heater. A suitable safety system, for
example EOSafe D/L, can be used to prevent this.